CONTRACTING
APPRENTICE BLOCK 2
☆7H-162.) Give some examples of when single source justification
would be used. - ANSWERS-1.) Urgency
2.) Exclusive licensing agreements
3.) Brand-name requirements
4.) Industrial mobilization
7H-162.) (True/False) In every single source justification the CO
must include the justification with the solicitation no matter the
dollar value. - ANSWERS-False. Only if the justification includes
brand-name specifications.
7H-162.) When dealing with single source justifications above the
MPT but below the SAT how must you write the justification? -
ANSWERS-There is no required format..
END OF
PAGE
1
, L3ABR6C031 LATEST
CONTRACTING
APPRENTICE BLOCK 2
7H-162.) When dealing with single source justifications above the
SAT how must you write the justification? - ANSWERS-A
justification IAW FAR Part 6 is required.
7H-162.) What FAR Part serves as a multi-page document
completed by various members of the MFT to permit the use of
other than full and open competition? - ANSWERS-FAR Part 6
Justification and Approval (J&A)
7H-163.) FAR Part 16 guides how we write and work with
___________________ ___________________ contracts. - ANSWERS-
Indefinite Delivery
7H-163.) FAR Part 16.505(b)(1)(i) requires what? - ANSWERS-The
CO to give all awardees of indefinite-delivery contracts a fair
opportunity to put a quote or offer on all delivery and task orders.
END OF
PAGE
2
, L3ABR6C031 LATEST
CONTRACTING
APPRENTICE BLOCK 2
☆7H-163.) When would an "Exception to Fair Opportunity" be
used? - ANSWERS-In instances of
1.) Unusual or compelling urgency
2.) If only one awardee is capable
3.) It falls under logical follow-on
4.) it is necessary to satisfy a minimum guarantee
5.) For orders exceeding the SAT, a statute expressly requires one
source
6.) Set-aside for one of the socio-economic programs.
END OF
PAGE
3
, L3ABR6C031 LATEST
CONTRACTING
APPRENTICE BLOCK 2
7H-164.) When dealing with Exception to Fair Opportunity above
the MPT but below the SAT how must the justification be written?
- ANSWERS-There is no required format, but the CO shall
document the basis for restricting consideration to an item
peculiar to one manufacturer.
7H-164.) When dealing with Exception to Fair Opportunity above
the SAT how must the justification be written? - ANSWERS-Each
justification shall contain specific information IAW FAR Part
16.505(b)(2)(ii)(B)
☆7H-164.) For an Exception to Fair Opportunity, the CO shall
publish a notice within 14 days after placing a(n)
___________________ exceeding the ___________________. - ANSWERS-
order, SAT
☆7I-167.) What is a determinations and findings (D&F) form? -
ANSWERS-It is a special form of written approval by an authorized
END OF
PAGE
4