Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

QSP EXAM STUDY 2025 QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
27
Grade
A+
Uploaded on
26-07-2025
Written in
2024/2025

A likely precipitation event is any weather pattern that is forecasted to have a ____% or greater probability of producing precipitation in the project area. a. 10 b. 25 c. 50 d. 75 e. 99 - ANS C A QSP is responsible for: a. Day to day implementation, inspections, and observations b. Amending the SWPPP as required c. Developing and certifying the SWPPP d. Certifying reports in SMARTS - ANS a. Day to day implementation, inspections, and observations A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an... a. Qualifying rain event b. Extended storm event QSP EXAM STUDY 2025 QUESTIONS AND ANSWERS 2 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED c. Inactive storm event d. Unsafe monitoring event - ANS a. Qualifying rain event A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is... a. erosion control b. run on/ run off control c. sediment control - ANS b. run on/ run off control Acceptable methods to demonstrate final stabilization include: a. 50%vegetative coverage b. 100% vegetative coverage c. RUSLE 2 method - ANS c. RUSLE 2 method Activities under the CGP include: a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. b. Disturbances to land surfaces solely related to agricultural operations. c. Clearing and grading 2 acres of land d. Discharges of storm water from areas on tribal lands. - ANS c. Clearing and grading 2 acres of land All NAL data must be uploaded within ___ after NAL exceedance has been identified a. 24 hours 3 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED b. 1 week c. 10 days d. 2 weeks - ANS c. 10 days Certain non-storm water discharges may be necessary for the completion of construction projects. Therefore the General Permit authorizes such discharges provided they meet the following conditions except: a. Meet the NALs for pH and turbidity b. Not cause or contribute to a violation of water quality standards c. Comply with BMPs as described in the SWPPP d. Be infeasible to eliminate e. Causes or threatens to cause pollution, contamination, or nuisance - ANS e. Causes or threatens to cause pollution, contamination, or nuisance Hydrologic source controls are a design technique that minimize and/or slow the rate of stormwater runoff from the site. Examples include: a. Reduction of pervious surfaces b. Use of landscaping as a storm drain treatment feature c. Drain rooftop downspouts to impervious areas d. Stormwater treatment facility - ANS b. Use of landscaping as a storm drain treatment feature If the R Factor is _

Show more Read less
Institution
QSP
Course
QSP

Content preview

QSP EXAM STUDY 2025 QUESTIONS
AND ANSWERS


A likely precipitation event is any weather pattern that is forecasted to have a ____% or greater
probability of producing precipitation in the project area.


a. 10
b. 25
c. 50
d. 75

e. 99 - ANS C


A QSP is responsible for:


a. Day to day implementation, inspections, and observations
b. Amending the SWPPP as required
c. Developing and certifying the SWPPP

d. Certifying reports in SMARTS - ANS a. Day to day implementation, inspections, and
observations


A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period
between rain events is a/an...


a. Qualifying rain event
b. Extended storm event
1 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED

,c. Inactive storm event

d. Unsafe monitoring event - ANS a. Qualifying rain event


A temporary or permanent structural BMP that directs concentrated flows away from disturbed
areas and prevents erosion is...


a. erosion control
b. run on/ run off control

c. sediment control - ANS b. run on/ run off control


Acceptable methods to demonstrate final stabilization include:


a. 50%vegetative coverage
b. 100% vegetative coverage

c. RUSLE 2 method - ANS c. RUSLE 2 method


Activities under the CGP include:


a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original
purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural operations.
c. Clearing and grading 2 acres of land

d. Discharges of storm water from areas on tribal lands. - ANS c. Clearing and grading 2 acres
of land


All NAL data must be uploaded within ___ after NAL exceedance has been identified


a. 24 hours

2 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED

, b. 1 week
c. 10 days

d. 2 weeks - ANS c. 10 days


Certain non-storm water discharges may be necessary for the completion of construction
projects. Therefore the General Permit authorizes such discharges provided they meet the
following conditions except:


a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate

e. Causes or threatens to cause pollution, contamination, or nuisance - ANS e. Causes or
threatens to cause pollution, contamination, or nuisance


Hydrologic source controls are a design technique that minimize and/or slow the rate of
stormwater runoff from the site. Examples include:


a. Reduction of pervious surfaces
b. Use of landscaping as a storm drain treatment feature
c. Drain rooftop downspouts to impervious areas

d. Stormwater treatment facility - ANS b. Use of landscaping as a storm drain treatment
feature


If the R Factor is ____, you can apply for the Erosivity Waiver.


a. 1
b. Less than 1
c. 5
3 Copyright ©2025 SIRJOEL ALL RIGHTS RESERVED

Written for

Institution
QSP
Course
QSP

Document information

Uploaded on
July 26, 2025
Number of pages
27
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
sirjoel Liberty University
Follow You need to be logged in order to follow users or courses
Sold
131
Member since
2 year
Number of followers
13
Documents
12789
Last sold
3 weeks ago
Sirjoel

Here you will find all documents and package deals offered by sirjoel

3.6

18 reviews

5
4
4
5
3
7
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions