If |your |tilesetters |had |completed |one |wall |and |were |about |to |start |the |other, |what |should |you
have |them |do? |- |CORRECT |ANSWER✔✔-Click |here |to |select |answer |A.
|
reclean |the |first |wall |after |48 |hours
|
| Click |here |to |select |answer |B.
wait |48 |hours |before |starting |the |opposite |(back) |side |of |the |same |wall
|
| Click |here |to |select |answer |C.
double-grout |the |first |side
|
| Click |here |to |select |answer |D.
repair |the |cracks
Answer:B
What |is |the |maximum |size |a |stone |veneer |slab |may |be |before |you |must |put |in |metal |rods? |-
CORRECT |ANSWER✔✔-Click |here |to |select |answer |A.
|
560 |sq |in
|
| Click |here |to |select |answer |B.
680 |sq |in
|
| Click |here |to |select |answer |C.
720 |sq |in
,|
| Click |here |to |select |answer |D.
840 |sq |in
Answer:C
With |which |of |the |following |should |you |clean |the |back |of |stone |before |installation? |- |CORRECT
ANSWER✔✔-Click |here |to |select |answer |A.
|
acetone
|
| Click |here |to |select |answer |B.
soap |powder
|
| Click |here |to |select |answer |C.
acid
|
| Click |here |to |select |answer |D.
baking |soda
Answer:B
What |is |the |correct |joint |size |for |tile |2-3/16" |square |or |smaller? |- |CORRECT |ANSWER✔✔-Click
|here |to |select |answer |A.
1/16" |to |1/8"
|
| Click |here |to |select |answer |B.
,1/8" |to |1/4"
|
Click |here |to |select |answer |C.
|
1/4" |to |3/4"
|
Click |here |to |select |answer |D.
|
1/8" |to |1/2"
Answer:A
Which |of |the |following |should |you |not |use |for |tile |backing? |- |CORRECT |ANSWER✔✔-Click |here
|to |select |answer |A.
flat-rib |metal |lath
|
Click |here |to |select |answer |B.
|
3/8" |rib |lath
|
Click |here |to |select |answer |C.
|
diamond |mesh
|
Click |here |to |select |answer |D.
|
neither |A |nor |B
Answer:D
, What |is |the |maximum |height |of |a |grab |bar |in |a |shower |with |disabled |access? |- |CORRECT
ANSWER✔✔-Click |here |to |select |answer |A.
|
30"
|
| Click |here |to |select |answer |B.
33"
|
| Click |here |to |select |answer |C.
36"
|
| Click |here |to |select |answer |D.
40"
Answer:C
If |fill |must |be |used |to |grade |the |floor |properly |in |order |to |receive |a |mortar |bed, |use: |-
CORRECT |ANSWER✔✔-Click |here |to |select |answer |A.
|
1 |part |portland |cement: |3 |parts |sand: |4 |parts |coarse |aggregate
|
| Click |here |to |select |answer |B.
2.5 |parts |portland |cement: |1 |part |sand: |5 |parts |coarse |aggregate
|
| Click |here |to |select |answer |C.
2.5 |parts |portland |cement: |5 |parts |sand: |1 |part |coarse |aggregate
|
| Click |here |to |select |answer |D.
Answers
If |your |tilesetters |had |completed |one |wall |and |were |about |to |start |the |other, |what |should |you
have |them |do? |- |CORRECT |ANSWER✔✔-Click |here |to |select |answer |A.
|
reclean |the |first |wall |after |48 |hours
|
| Click |here |to |select |answer |B.
wait |48 |hours |before |starting |the |opposite |(back) |side |of |the |same |wall
|
| Click |here |to |select |answer |C.
double-grout |the |first |side
|
| Click |here |to |select |answer |D.
repair |the |cracks
Answer:B
What |is |the |maximum |size |a |stone |veneer |slab |may |be |before |you |must |put |in |metal |rods? |-
CORRECT |ANSWER✔✔-Click |here |to |select |answer |A.
|
560 |sq |in
|
| Click |here |to |select |answer |B.
680 |sq |in
|
| Click |here |to |select |answer |C.
720 |sq |in
,|
| Click |here |to |select |answer |D.
840 |sq |in
Answer:C
With |which |of |the |following |should |you |clean |the |back |of |stone |before |installation? |- |CORRECT
ANSWER✔✔-Click |here |to |select |answer |A.
|
acetone
|
| Click |here |to |select |answer |B.
soap |powder
|
| Click |here |to |select |answer |C.
acid
|
| Click |here |to |select |answer |D.
baking |soda
Answer:B
What |is |the |correct |joint |size |for |tile |2-3/16" |square |or |smaller? |- |CORRECT |ANSWER✔✔-Click
|here |to |select |answer |A.
1/16" |to |1/8"
|
| Click |here |to |select |answer |B.
,1/8" |to |1/4"
|
Click |here |to |select |answer |C.
|
1/4" |to |3/4"
|
Click |here |to |select |answer |D.
|
1/8" |to |1/2"
Answer:A
Which |of |the |following |should |you |not |use |for |tile |backing? |- |CORRECT |ANSWER✔✔-Click |here
|to |select |answer |A.
flat-rib |metal |lath
|
Click |here |to |select |answer |B.
|
3/8" |rib |lath
|
Click |here |to |select |answer |C.
|
diamond |mesh
|
Click |here |to |select |answer |D.
|
neither |A |nor |B
Answer:D
, What |is |the |maximum |height |of |a |grab |bar |in |a |shower |with |disabled |access? |- |CORRECT
ANSWER✔✔-Click |here |to |select |answer |A.
|
30"
|
| Click |here |to |select |answer |B.
33"
|
| Click |here |to |select |answer |C.
36"
|
| Click |here |to |select |answer |D.
40"
Answer:C
If |fill |must |be |used |to |grade |the |floor |properly |in |order |to |receive |a |mortar |bed, |use: |-
CORRECT |ANSWER✔✔-Click |here |to |select |answer |A.
|
1 |part |portland |cement: |3 |parts |sand: |4 |parts |coarse |aggregate
|
| Click |here |to |select |answer |B.
2.5 |parts |portland |cement: |1 |part |sand: |5 |parts |coarse |aggregate
|
| Click |here |to |select |answer |C.
2.5 |parts |portland |cement: |5 |parts |sand: |1 |part |coarse |aggregate
|
| Click |here |to |select |answer |D.