Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CGEIT-C5 EXAM 2025 QUESTIONS AND ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
11
Cijfer
A+
Geüpload op
30-07-2025
Geschreven in
2024/2025

Which of the following contract clauses should an outsourcing provider seek to minimize to cost and improve service levels A Operating systems and hardware refresh frequenices B. Penalities for noncompliance C. Gain-sharing performance bonuses D. Charges tied to variable cost metrics - ANS C. Gain-sharing performance bonuses Because the outsourcer will share a percentage of the achieved savings there is finanical incentive to go above and beyond Which of the following is the best metric of IT resource performance A.IT personnel turnover B. The percentage of IT personnel certified according to job needs C. The frequency of job rotation D. The level of stakeholder statisfaction with IT personnel skills and expertise - ANS D. The level of stakeholder statisfaction with IT personnel skills and expertis Stakeholders satsifaction is the ultimate goal if you get that correct than you are meeting objectives Which of the following is the PRIMARY objective of IT resource management A. Ensuring personnel availability B. Identifying sourcing alternatives C. Identifying strategic job categories CGEIT-C5 EXAM 2025 QUESTIONS AND ANSWERS 2 Copyright ©2025 BRAINBARTER ALL RIGHTS RESERVED D. Aligning IT resources to ensure project success - ANS D. Aligning IT resources to ensure project success The ulitmate goal is to meet the needs of the business and to ensure that you have the resources positioned to succeed. How can IT resource planning be distinguised from IT project planning A. Resource planning is demaned driven while project planning is supply driven B. Resource is supply driving whie project planning is demand driven C. Resource planning is the broader concept and includes project planning D. Resource planning is retrospective while project planning is prospective - ANS D. Resource planning is retrospective while project planning is prospective The thought is the reach of resource is much with internal and external resources and includes a wider range of inputs and outputs. Which of of the following is the MAIN benefit to an enterprise implementing IT governance A. Reducing inefficient use of resources B. Helping to establish clear authority levels C. Facilitating the monitoring or risk management strategies D. Assisting in approving financial plans and budgets - ANS A. Reducing inefficient use of resources Also Aligning IT w/Business Helping to proritize requests Reducing redundancy in portfolio Minimize business loss..for bad project etc Reducing the failure for IT to do what they promise By evaulating application devlopment projects against their peformance measurement criteria a CIO should be able to verify that A. Reliable products are

Meer zien Lees minder
Instelling
CGEIT
Vak
CGEIT

Voorbeeld van de inhoud

CGEIT-C5 EXAM 2025 QUESTIONS AND
ANSWERS


Which of the following contract clauses should an outsourcing provider seek to minimize to cost
and improve service levels
A Operating systems and hardware refresh frequenices
B. Penalities for noncompliance
C. Gain-sharing performance bonuses

D. Charges tied to variable cost metrics - ANS C. Gain-sharing performance bonuses
Because the outsourcer will share a percentage of the achieved savings there is finanical
incentive to go above and beyond


Which of the following is the best metric of IT resource performance
A.IT personnel turnover
B. The percentage of IT personnel certified according to job needs
C. The frequency of job rotation

D. The level of stakeholder statisfaction with IT personnel skills and expertise - ANS D. The
level of stakeholder statisfaction with IT personnel skills and expertis
Stakeholders satsifaction is the ultimate goal if you get that correct than you are meeting
objectives


Which of the following is the PRIMARY objective of IT resource management
A. Ensuring personnel availability
B. Identifying sourcing alternatives
C. Identifying strategic job categories



1 Copyright ©2025 BRAINBARTER ALL RIGHTS RESERVED

, D. Aligning IT resources to ensure project success - ANS D. Aligning IT resources to ensure
project success
The ulitmate goal is to meet the needs of the business and to ensure that you have the
resources positioned to succeed.


How can IT resource planning be distinguised from IT project planning
A. Resource planning is demaned driven while project planning is supply driven
B. Resource is supply driving whie project planning is demand driven
C. Resource planning is the broader concept and includes project planning

D. Resource planning is retrospective while project planning is prospective - ANS D. Resource
planning is retrospective while project planning is prospective
The thought is the reach of resource is much with internal and external resources and includes
a wider range of inputs and outputs.


Which of of the following is the MAIN benefit to an enterprise implementing IT governance
A. Reducing inefficient use of resources
B. Helping to establish clear authority levels
C. Facilitating the monitoring or risk management strategies

D. Assisting in approving financial plans and budgets - ANS A. Reducing inefficient use of
resources
Also
Aligning IT w/Business
Helping to proritize requests
Reducing redundancy in portfolio
Minimize business loss..for bad project etc
Reducing the failure for IT to do what they promise


By evaulating application devlopment projects against their peformance measurement criteria
a CIO should be able to verify that
A. Reliable products are guranteed


2 Copyright ©2025 BRAINBARTER ALL RIGHTS RESERVED

Geschreven voor

Instelling
CGEIT
Vak
CGEIT

Documentinformatie

Geüpload op
30 juli 2025
Aantal pagina's
11
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brainbarter Kaplan University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
357
Lid sinds
2 jaar
Aantal volgers
158
Documenten
22878
Laatst verkocht
2 dagen geleden
A+ STUDY MATERIALS.

We offer a wide range of high-quality study materials, including study guides practice exams and flashcards. WELCOME.

3.6

58 beoordelingen

5
24
4
8
3
13
2
4
1
9

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen