2025/2026 Exam Questions and Answers
| 100% Solved
A project team is assessing existing luminaires for Light Pollution Reduction and
found some fixtures emit light at a vertical angle more than 90 degrees from
straight down. What statement is true regarding the project's ability to earn the
credit? - 🧠 ANSWER ✔✔The team must retrofit or replace the non-compliant
fixtures to earn the credit
An office building has six individual workstations, two private offices, and a
conference room. What lighting control configuration would meet the requirements
of EQ Credit Interior Lighting? - 🧠 ANSWER ✔✔Individual lighting controls for
four workstations and multizone control for the conference room.
There are 8 individual occupant spaces, so any combination that equals 50% of the
individual spaces would count as meeting the requirements.
,When occupancy data is entered into the indoor water use calculator, it is split by
default to a 50/50 gender ratio. Under which circumstance should this be ratio
changed? - 🧠 ANSWER ✔✔A project can alter the default ratio if it is justified.
Same-sex schools are one example.
What frequency of recording data is required during the performance period for
WE Credit Water Metering? - 🧠 ANSWER ✔✔All meters, including whole-
building meter, must be recorded at least weekly and used in a regular analysis of
time trends
Typical end uses for a commercial office building that may require advanced
metering for EA Credit Advanced Energy Metering include all of the following
except: - 🧠 ANSWER ✔✔Projects must sub-meter all energy end uses that are at
least 20% of the total building energy use excluding plug loads.
A project team has an existing building commissioning plan resulting from the
analysis of the building. What can this document serve as the foundation of? - 🧠
ANSWER ✔✔The Ongoing Commissioning credit can use existing building
commissioning plan to create the ongoing commissioning plan.
A project team for an office building took daylight measurements in all regularly
occupied spaces in the month of June. Which action must occur for the project to
, 3
achieve Daylight Measurement for EQ Credit Daylight and Quality Views? - 🧠
ANSWER ✔✔Two measurements must be taken for the option.
How frequently should occupant surveys be performed to achieve IEQ Credit
Occupant Comfort Survey? - 🧠 ANSWER ✔✔Perform at least one survey and
implement corrective actions. At a minimum, perform one new survey at least once
every 2 years.
As an alternative refrigerant to HCFC a project team is considering HFC-410A.
What is the trade-off to when using HFC-410A in the HVAC&R system? - 🧠
ANSWER ✔✔It has a lower GWP but require more energy to achieve the same
level of cooling.
Who should be included in the project team for SS Credit Site Improvement Plan?
- 🧠 ANSWER ✔✔Anyone having to do with the land should be involved with this
credit as part of the integrated team:
Landscape architect
Hydrologist
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED
, Civil engineer
Restoration ecologist
Landscape designers
Maintenance staff
Project teams should coordinate the solid waste management policy and the
environmentally preferred purchasing policy in what areas? - 🧠 ANSWER
✔✔Areas such as source reduction, contract agreements, communications with
building occupants overlap between the two policies.
A project team is inventorying the regularly occupied spaces of an office building
occupied by one tenant. Under what circumstances could any of the regular
occupied spaces be excluded from the requirements of daylighting? - 🧠 ANSWER
✔✔When tasks would be hindered by the use of daylight
This is the only exception allowed.
A project team is reviewing a project's goals. What type of analysis would be
appropriate for existing building commissioning? - 🧠 ANSWER ✔✔The focus is
on proper system operations