NEBOSH CERTIFICATION NGC1 LATEST 2025/2026 ACTUAL EXAM
WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS
(100% VERIFIED ANSWERS) |ALREADY GRADED A+| ||PROFESSOR
VERIFIED|| ||BRANDNEW!!!||
Under CDM what duties are assigned to the Designers? -
ANSWER-The designer should ensure that:
The client is aware of their duties under CDM2015
Their design minimizes health and safety risks created by their
project
design information is passed to the other duty holders
communicate and cooperate with other designers and contractors
Under CDM what duties are assigned to the Principle Designers?
- ANSWER-They plan manage and coordinate health and safety
during the preconstruction phase
,2|Page
The client is advised on the bringing together of the
preconstruction information that will be useful to the contractors
and designers
Their design minimizes health and safety risks created by their
project
Communication, co-operation and co-ordination takes place
during the pre-construction phase
The Health and Safety File is prepared and passed to the client at
the end of the project
Under CDM what duties are assigned to the Principle
Contractors? - ANSWER-They plan manage and coordinate
health and safety during the construction phase
A construction phase plan exists and is kept up to date
The site is secure
,3|Page
All workers have access to suitable welfare facilties
All contractors recieve site specific induction training
Workers are consulted on health and safety issues
Under CDM what duties are assigned to the Contractors? -
ANSWER-The client is aware of his duties under CDM2015
They plan and manage their own work to control safety risks
The workers have the skills and training to carry out their work
safely
They provide information, instruction and supervision to their
workers
, 4|Page
Under CDM what duties are assigned to the Workers - ANSWER-
Should take care of their own health and safety and the health
and safety of others who's work they may affect
Report anything that they see which may affect their own or
others health and safety
Cop-operate with all duty holders
What is in the construction phase plan? - ANSWER-******Project
Description
- including team members
******Management of the work:
- Site Rules
- Arrangements for ensuring co-operation between
parties
- Arrangements for consultation
- Site induction