In linear programming, what are restrictions that limit the degree to which a
manager can pursue an objective?
a. limitations
b. gatekeepers
c. resource rules
d. constraints - ANSWER-constraints
If A, B, and C are variables, which of the following functions is NOT linear?
a. 2A + 3B + 6C
b. 14A −4B + C
c. A
d. ABC - ANSWER-ABC
Two or more products are produced using limited resources. The firm would like
to determine how many units of each product it should produce to maximize
overall profit given its limited resources.
This situation describes what type of problem in linear programming?
1|Page
, OPSY 5315 RAO Exam 3 Actual Exam Test Bank
a. product-mix
b. production-quantity
c.sensitivity
d. product-scheduling - ANSWER-product-mix
In a typical product-mix problem in linear programming, the variables are defined
as
a. the available labor hours in each department.
b. the revenue generated from selling each product.
c. the hours of labor actually used in each department.
d. the number of units of each product produced. - ANSWER-the number of units
of each product produced.
In a typical product-mix problem in linear programming, the objective is to
a. maximize profit.
b. minimize cost.
c. minimize resource usage.
d. maximize total production. - ANSWER-maximize profit.
In a typical product-mix problem in linear programming, each general constraint
states that
2|Page
, OPSY 5315 RAO Exam 3 Actual Exam Test Bank
a. the amount of a resource used less than or equals≤the amount of resource
available.
b. the number of products produced less than or equals≤the amount of resource
available.
c. the number of products produced greater than or equals≥the amount of
resource available.
d. the amount of a resource used greater than or equals≥the amount of resource
available. - ANSWER-the amount of a resource used less than or equals≤the
amount of resource available.
In linear programming, what is a numerical value that is given in a model?
a. objective
b. conditional value
c. parameter
d. variable - ANSWER-parameter
In linear programming, what is another name for sensitivity analysis?
a. robustness analysis
b. postoptimality analysis
c. regression analysis
d. parametric analysis - ANSWER-postoptimality analysis
3|Page
, OPSY 5315 RAO Exam 3 Actual Exam Test Bank
What is the value of one additional unit of a scarce resource in LP?
a. resource value
b. incremental value
c. conditional value
d. shadow price - ANSWER-shadow price
A work center had actual input of 280 hours and actual output of 270 hours. What
is the change in backlog?
a. -10
b. 0
c. 10 - ANSWER-10
Which of the following is an aid used to monitor jobs in process?
a. A Gantt scheduling chart
b. The assignment method
c. Johnson's rule - ANSWER-A Gantt scheduling chart
Forward scheduling is the scheduling of __________.