Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
69
Cijfer
A+
Geüpload op
04-08-2025
Geschreven in
2025/2026

SOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERSSOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERSSOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERS

Instelling
SOS NERC Prep - RELIABILITY
Vak
SOS NERC Prep - RELIABILITY

Voorbeeld van de inhoud

SOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERS

The Reliability Coordinator just informed you of a slow time error correction
L L L L L L L L L L L




which will begin at the top of the next hour. Your EMS system will not let you
L L L L L L L L L L L L L L L L L




change your scheduled frequency. Your Frequency Bias Setting is -100
L L L L L L L L L L




MW/.1Hz. What action should you take?
L L L L L L




A) Increase Net Interchange Schedule by 20 MWs. L L L L L L




B) Inform the Reliability Coordinator that you cannot participate in the time error
L L L L L L L L L L L




correction.
L




C) Decrease Net Interchange Schedule by 20 MWs. L L L L L L




D) Increase Net Interchange Schedule by 10 MWs. - A) Increase Net Interchange
L L L L L L L L L L L




Schedule by 20 MWs.
L L L L




A Balancing Authority has a sudden loss of a large block of load in its area. This loss will
L L L L L L L L L L L L L L L L L L




be seen instantaneously in the change of which of the following values?
L L L L L L L L L L L L




1. Actual Net Interchange L L




2. Scheduled Frequency L




3. Scheduled Net Interchange L L




4. Area Control Error L L




A) 4 only L




B) 1 & 3 L L




C) 1 & 4 L L




D) 3 & 4 - C) 1 & 4
L L L L L L L




Metered Data included in the calculation of ACE are: dynamic schedules, pseudo
L L L L L L L L L L L




ties, actual frequency, and all
L L . L L L L




A) Tie lines readings
L L




B) Generators output L




C) Scheduled frequency indications L L

,D) Transformer load - A) Tie lines readings L L L L L L




Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net
L L L L L L L L L L L L L




Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If
L L L L L L L L L L L L L L




Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz, what is ACE?
L L L L L L L L L L L L L




A) -100
B) 0
C) 10
D) 100 - A) -100 L L L




A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to
L L L L L L L L L L L L L




1600 on a summer day. The Net Interchange Actual for those same hours respectively
L L L L L L L L L L L L L L




were -230 MW, -275 MW, -250 MW and -270 MW. What was the Balancing
L L L L L L L L L L L L L L




Authority's Inadvertent Interchange for the 4-hour period?
L L L L L L L




A) 6 MWs out L L




B) 25 MWs in L L




C) 25 MWs out L L




D) 6 MWs in - B) 25 MWs in
L L L L L L L




For the ACE equation to work properly, dynamic schedules, pseudo ties,
L L L L L L L L L L




frequency, and all
L must be metered.L L L L L




A) Generation
B) Communications
C) Transformers
D) Tie lines - D) Tie lines L L L L L




If the frequency bias setting is set to a less negative value than the frequency response
L L L L L L L L L L L L L L L




of a Balancing Authority and a frequency increase is caused by a sudden loss of load in
L L L L L L L L L L L L L L L L L




an external balancing area, what will be the result?
L L L L L L L L L




A) The ACE will be zero and will take no AGC action
L L L L L L L L L L




B) The ACE will be a negative value and AGC will increase generation
L L L L L L L L L L L

,C) The ACE will be a positive value and AGC will lower generation
L L L L L L L L L L L




D) This will not affect the ACE - B) The ACE will be a negative value and AGC will
L L L L L L L L L L L L L L L L L




increase generation
L L




If the frequency bias setting is less negative than the frequency response of a Balancing
L L L L L L L L L L L L L L




Authority and a frequency decline is caused by a sudden loss of generation in an
L L L L L L L L L L L L L L L




external balancing area, what will be the result?
L L L L L L L L




A) The ACE will be a negative value and AGC will increase generation.
L L L L L L L L L L L




B) This will not affect the ACE.L L L L L




C) The ACE will be a positive value and AGC will lower generation.
L L L L L L L L L L L




D) The ACE will be zero and will take no AGC action. - C) The ACE will be a
L L L L L L L L L L L L L L L L L




positive value and AGC will lower generation.
L L L L L L L




It is the responsibility of which entity/entities to develop, maintain, and implement
L L L L L L L L L L L




load shedding plans?
L L L




A) Transmission Operators and Balancing Authorities L L L L




B) Reliability Coordinator L




C) Load Serving Entities L L




D) Balancing Authority - A) Transmission Operators and Balancing Authorities
L L L L L L L L




A Transmission line is loaded 25% above its SOL. A parallel line is out for routine
L L L L L L L L L L L L L L L




maintenance and can be placed in service in 10 minutes. What is the first step the
L L L L L L L L L L L L L L L L




Operator should take to reduce the line loading?
L L L L L L L L




A) Shed load at the downstream bus.
L L L L L

, B) Open the line. Ld Ld




C) Re-Dispatch Generation. Ld




D) Initiate the restoration of the parallel line. - D) Initiate the restoration of the
Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld




Ld parallel line. Ld




As a Transmission Operator, you realize that the voltage level is starting to decline
Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld




in the North West part of the system. Which of the following devices should you,
Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld




as a Transmission Operator, be able to operate, and/or have another entity operate
Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld




to raise the voltage level back to normal in the North West part of the system?
Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld




A) Transformer Underload Tap Changers Ld Ld Ld




B) Shunt Capacitor Banks Ld Ld




C) Generator Reactive Output Ld Ld




D) All answers are correct - D) All answers are correct
Ld Ld Ld Ld Ld Ld Ld Ld Ld




Voltage reduction for load relief should be made on the
Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld .

A) Distribution system Ld




B) Entire Interconnection simultaneously
Ld Ld




C) Tie-lines with other Balancing Authority Areas Ld Ld Ld Ld Ld




D) Transmission System - A) Distribution system Ld Ld Ld Ld Ld




Under Frequency Load Shedding (UFLS) is to stabilize the imbalance between
Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld




generation and load that has been created by a system disturbance. This is
Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld




accomplished by
Ld . Ld Ld




A) Tripping generation first Ld Ld




B) Voltage reduction on the distribution system.
Ld Ld Ld Ld Ld




C) Shedding all load to arrest frequency Ld Ld Ld Ld Ld




D) Shedding load prior to generation tripping - D) Shedding load prior to
Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld Ld




generation tripping
Ld Ld

Geschreven voor

Instelling
SOS NERC Prep - RELIABILITY
Vak
SOS NERC Prep - RELIABILITY

Documentinformatie

Geüpload op
4 augustus 2025
Aantal pagina's
69
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TestBankPrep Strayer University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
50
Lid sinds
1 jaar
Aantal volgers
5
Documenten
1213
Laatst verkocht
1 week geleden
TestBankPrep Stores.

4.9

294 beoordelingen

5
285
4
2
3
2
2
0
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen