GDOT Asphalt QC LEVEL 1
Save
Practice questions for this set
Learn 1 /7 Study with Learn
GSP 21
Choose an answer
How long after the contract has
How often should weight systems for
1 2 been awarded do you have to submit
lime be checked?
Job Mix Formulas?
What procedure governs the
What procedure is used to sample
3 4 sampling procedures for contractor
bituminous materials?
acceptance testing of HMA?
Don't know?
Terms in this set (37)
https://quizlet.com/1064603080/gdot-asphalt-qc-level-1-flash-cards/?new 1/5
, 8/8/25, 4:00 PM GDOT Asphalt QC LEVEL 1 Flashcards | Quizlet
What procedure is used to GSP 10
sample bituminous
materials?
What procedure is used to GSP 15
sample hot mix asphalt
mixtures from full trucks,
roadways, or occasionally
partially loaded trucks?
How do you take a HMA Shovel off about 60% of the cone and go atleast 6
sample from a truck? inches deep.
What kind of shovel do A square nosed shovel.
you use to take a sample
off of a truck?
What procedure governs GSP 21
the sampling procedures
for contractor acceptance
testing of HMA?
When should the QC take Every time a sample is take. +\- 20f or +\- 11c
the temperature of the mix
and what is the tolerance?
If a sample meets a 1.00 3 days
pay factor, how many days
does the department have
to pick it up before it can
be discarded?
If a sample does not meet 7 days
a 1.00 pay factor, how
many days does the
department have to pick it
up before it can be
discarded?