com plete ver ifi ed solu tions (Gu ar anteed
Su ccess )
Correct type property code to be utilized for allowance items -
answer Type I A-E
Type II H-N
Type III T-X
Purpose of the TO&E reconciliation - answer To validate
allowances on the TO/E are accurate and properly recorded on
property records
Define in writing the purpose of the reports used to validate the
unit's allowances - answer T/O - mission of the unit, total unit
strength, and the basis from which individual weapons
requirements are generated.
T/E - lists the unit's authorized requirement quantities
(allowances) for ground equipment.
MAL - Control T/E and special allowance within the command
Process for submitting a TO&E Challenge of inaccurate allowance
data - answer A TOECR submitted to DC CD&I (TFSD) via chain
, of command to increase, decrease, add, or delete an established
Type 1 allowance
Which action will require a TO&E Change Request - answer The
T/E asset allowance quantities are not appropriate and conductive
to the accomplishment of the assigned mission
Approving authority for a TO&E Change Request - answer DC
CD&I TFSD
Publication that identifies Material Readiness Reporting (MRR)
reportable items - answer MCBUL 3000
Timeframe for conducting a reconciliation between the
Mechanized Allowance List (MAL) and a Material Readiness
Reporting (MRR) report - answer Monthly or as directed by the
CO
(OPEN BOOK) Given a situation to report Material Readiness
Reporting (MRR) items to higher headquarters, explain in writing
the procedures to reconcile Material Readiness Reporting (MRR)
items - answer MCBUL 3000
MAL