The purpose of a location specific plan for carrying out elements
contractor safety action of a company's safety management system
plan is?
All:
A contractor employer maintained with each work group on BNSF railway
must ensure that its property
safety action plan(s) Available withe the BNSF project
are: Representative or Employee in charge
Uploaded to Contractor Orientation at
www.bnsfcontractor.com
The 24 hour BNSF True
emergency number to
call if an incident or
injury occurs is 1-800-
832-5452 and is located
in the first page of the
contractor safety
action plan and your
1/
12
, 8/13/25, 2:47
PM
contractor orientation
badge
1. C
2. D
3. A
Verify job location for
the following week
Which of the following is should be:
NOT a step in a job Discussing the task at hand
Safety Briefing? Delegate and discuss life
saving processes
Establish cues to pause
the work
sungl
Which of the following is asses
Not a form of personal These
protection? are:
Hard Hat, Safety toed
work boots reflective
vest
Good housekeeping and All:
material storage can Keeping walk ways clear of hazards
prevent injuries and Posting approperiate warning signs to identify hazards
includes the Properly storing flammable and combstible liquids and
following activies. gases
Latter Ascending/Descending - An exposure that
exists when a person or an object may be
unexpectedly struck.