PM
BNSF ROADWAY WORKER PROTECTION EXAM
QUESTIONS AND ANSWERS WITH COMPLETE
SOLUTIONS VERIFIED LATEST UPDATE
GRADED A++ 2025/2026
Terms in this set (25)
Roadway Worker Must be renewed annually.
Protection training
The cardinal rule of Always expect a train or equipment to move on
railroading is: any track in either direction at any time.
"Fouling" the track 4
means being within __
feet of the field side
of the nearest rail.
According to the FRA, A person or equipment could be struck by a train or on-
when working in the foul: track equipment.
The following are Contractor employees whose duties for a railroad client
roadway workers. may require fouling a track.
Roadway workers are Prior to fouling the track.
responsible to ascertain
on track safety is
provided:
A roadway worker shall When necessary for the performance of duty.
not foul a track except
:
1/
5
, 8/13/25, 2:48
PM
Roadway workers who Must be trained in the General Code of Operating Rules
perform work in the
fouling space must do
all of the following
except:
What must an EIC do Conduct an on-track safety job briefing.
before any roadway
worker fouls a track?
When is an on-track When each roadway worker acknowledges
safety job briefing understanding of protection provided.
considered complete?
A roadway worker has a The EIC.
"Right to
Challenge". When
concerned about
compliance with on-track
safety rules
he/she must report
his/her concerns to:
The work to be performed
The type of track on which the
work will be performed The
The method of on-track weather and physical
safety used depends characteristics of the track
on what factors? ALL OF THE ABVOVE
When using train At least 15 seconds prior to train arrival.
approach warning
method of on-track
safety, roadway
2/
5