Final Exam: NN310 |2025 Update
Actual exam|Complete Frequently
Tested Questions And Verified
Answers With Rationales|100%
Accurate Answers | Already Graded
A+
Save
Practice questions for this set
Learn
Studied 7 terms
Nice work, you're crushing it
Continue studying in Learn
,Terms in this set (129)
The _______ certifies IMO
a system as an
ECDIS making it
the legal
equivalent to
paper charts
Which of the Eliminates need for all other
following is NOT navigation tools
an advantage of
ECDIS
What two pieces Cross-Track Error
of information are Distance and time to run
automatically
calculated by
ECDIS for
watchstander SA?
Which type of ECDIS-N
system below
best describes
VMS?
, Which is not an Zooming reveals details
advantage of
raster chart?
NGA's Digitial True
Nautical Charts
(DNC) are vector
based
___________ charts Raster Nautical
are a scanned
copy of paper
charts
Which of the ECDIS gives waypoint
following is not a recommendations as you are planning
functional your route
requirement of
ECDIS?
Which of the Automatic Chart Update
following is NOT
part of the ECDIS
architecture?
ECDIS Civilian electronic charting system
ECDIS-N US Navy electronic charting system
Actual exam|Complete Frequently
Tested Questions And Verified
Answers With Rationales|100%
Accurate Answers | Already Graded
A+
Save
Practice questions for this set
Learn
Studied 7 terms
Nice work, you're crushing it
Continue studying in Learn
,Terms in this set (129)
The _______ certifies IMO
a system as an
ECDIS making it
the legal
equivalent to
paper charts
Which of the Eliminates need for all other
following is NOT navigation tools
an advantage of
ECDIS
What two pieces Cross-Track Error
of information are Distance and time to run
automatically
calculated by
ECDIS for
watchstander SA?
Which type of ECDIS-N
system below
best describes
VMS?
, Which is not an Zooming reveals details
advantage of
raster chart?
NGA's Digitial True
Nautical Charts
(DNC) are vector
based
___________ charts Raster Nautical
are a scanned
copy of paper
charts
Which of the ECDIS gives waypoint
following is not a recommendations as you are planning
functional your route
requirement of
ECDIS?
Which of the Automatic Chart Update
following is NOT
part of the ECDIS
architecture?
ECDIS Civilian electronic charting system
ECDIS-N US Navy electronic charting system