Actual 2025/2026 Air assault Phase 2 test FY with Complete & Verified Solutions
Actual 2025/2026 Air assault Phase 2 test FY with Complete & Verified Solutions What does TM 4-48.09 cover ? - ️️Basic operations and equipment What does TM 4-48.10 cover? - ️️Single point load rigging procedures What does TM 4-48.11 cover? - ️️Dual point load rigging procedures What are the common uses of slingloads? - ️️Ship to shore movement Over the battle field Shore to ship movement Firepower emplacement What are the sling load classifications? - ️️Certified Unique Prohibited Suitable What is a single point load configuration, dual point, tandem, side by side and multi single point load configuration? - ️️SP: one load rigged, uses one cargo hook DP: one load rigged, uses two cargo hooks
Geschreven voor
- Instelling
- Air assault phase 2
- Vak
- Air assault phase 2
Documentinformatie
- Geüpload op
- 23 augustus 2025
- Aantal pagina's
- 10
- Geschreven in
- 2025/2026
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
actual air assault phase 2 test fy with