ECCC GE EXAM WITH CORRECT
QUESTIONS AND ANSWERS 2025
USACE Response Options - CORRECT-ANSWERSForward Engineer Support Team-
Advance (FEST-A) or Reconnaissance Team (RT)
Advanced Echelon (ADVON) team
Contingency Engineer District (CED)
Reconnaissance Tasks - CORRECT-ANSWERSTechnical Reconnaissance (**General
Engineers)
Infrastructure Survey
Environment Assessment
Airfield Assessment
Route Classification
Tactical Reconnaissance (**Combat Engineers)
Bridge Reconnaissance
,Route Reconnaissance
Obstacle Reconnaissance
Reconnaissance vs. Classification - CORRECT-ANSWERSClassification is done by General
Engineers
Reconnaissance is done by Combat Engineers
SWEAT-MSO - CORRECT-ANSWERSSewage
Water
Electricity
Academics
Trash
Medical
Safety
Other Considerations
, MDMP and Construction Planning - CORRECT-ANSWERSMDMP nests within
construction planning and EN requirements for sustainment
Project Origin/Routing - CORRECT-ANSWERSUnit requests on a DA4283
Go to DPW for approval
Create list for troop construction requests
S3 syncs with DPW for project
Projects are picked and project packet are given; scope of work, site plan, and drawings
S3C produces construction directive, BOM, and Construct Activities
Project assigned to executing company
Definable Features of Work - CORRECT-ANSWERSproject supervisor identifies features
of work during estimating and scheduling process. "Task which is sperate and distinct
from other tasks, has separate control requirements, and may be identified by different
trades or disciplines, or it may be work by the same trade in a different environment"
For each definable feature of work - CORRECT-ANSWERSPrep Phase: apply network
analysis, scheduling, estimating
Initial Phase: Choosing configuration, materials, equipment
QUESTIONS AND ANSWERS 2025
USACE Response Options - CORRECT-ANSWERSForward Engineer Support Team-
Advance (FEST-A) or Reconnaissance Team (RT)
Advanced Echelon (ADVON) team
Contingency Engineer District (CED)
Reconnaissance Tasks - CORRECT-ANSWERSTechnical Reconnaissance (**General
Engineers)
Infrastructure Survey
Environment Assessment
Airfield Assessment
Route Classification
Tactical Reconnaissance (**Combat Engineers)
Bridge Reconnaissance
,Route Reconnaissance
Obstacle Reconnaissance
Reconnaissance vs. Classification - CORRECT-ANSWERSClassification is done by General
Engineers
Reconnaissance is done by Combat Engineers
SWEAT-MSO - CORRECT-ANSWERSSewage
Water
Electricity
Academics
Trash
Medical
Safety
Other Considerations
, MDMP and Construction Planning - CORRECT-ANSWERSMDMP nests within
construction planning and EN requirements for sustainment
Project Origin/Routing - CORRECT-ANSWERSUnit requests on a DA4283
Go to DPW for approval
Create list for troop construction requests
S3 syncs with DPW for project
Projects are picked and project packet are given; scope of work, site plan, and drawings
S3C produces construction directive, BOM, and Construct Activities
Project assigned to executing company
Definable Features of Work - CORRECT-ANSWERSproject supervisor identifies features
of work during estimating and scheduling process. "Task which is sperate and distinct
from other tasks, has separate control requirements, and may be identified by different
trades or disciplines, or it may be work by the same trade in a different environment"
For each definable feature of work - CORRECT-ANSWERSPrep Phase: apply network
analysis, scheduling, estimating
Initial Phase: Choosing configuration, materials, equipment