QUESTIONS And CORRECT Answers
1. REC log
2. REC form
3. REC Continuation Page
4. REC Continuation Rework Page
5. Test and Inspection Cover Page
6. Controlled Assembly Report Page 1 and 2
7. Joint Tightness Test
8. Valve Seat Tightness Test
9. Hydrostatic/Pneumatic Test
10. System Drop Test
11. DFS Log
12. DFS Report
13. DFS Clearance Sheet - CORRECT ANSWERS Name 13 REC forms
System, Issue/Open/Close, Remarks, Signatures - CORRECT ANSWERS REC Log
Work Description Including Boundaries, Approval for Re-Entry into the System, REC complete
signatures - CORRECT ANSWERS REC form
References, Enclosures, Parts/Materials, Precautions/Prerequisites - CORRECT
ANSWERS REC continuation page
, Description of Items, Description of Test, Results, Whos Performing Test - CORRECT
ANSWERS Test and Inspection Cover Page
Required Test Pressure, Joint ID, SAT/UNSAT - CORRECT ANSWERS Joint Tightness Test
Test Media, Valve #, SAT/UNSAT - CORRECT ANSWERS Valve Seat Tightness Test
Required Test Points, Date of Test, Required Test Pressure, SAT/UNSAT - CORRECT
ANSWERS Hydrostatic/Pneumatic Test
Gauge Range, Duration of Test, Allowable System Drop, SAT/UNSAT - CORRECT
ANSWERS System Drop Test
System, Major or Minor, Permanent or Temporary - CORRECT ANSWERS DFS Log
Major or Minor, Temporary or Permanent, Tech Drawings, CO Approval and Signature -
CORRECT ANSWERS DFS Report
Subject, Justification, Clear or Cancel, Signed by SCA - CORRECT ANSWERS DFS Clearance
REC Supervisor/Senior Diving Supervisor - CORRECT ANSWERS Who opens a REC?
REC Supervisor/Senior Diving Supervisor/CO Representative - CORRECT ANSWERS Who
closes a REC?
At initial install, major overhaul, or system exceeds operational limits - CORRECT
ANSWERS When is a system certified/re-certified?