answered already passed
1. A member of the
Other than a Deputy State Fire Marshal of the Division of State
LP Gas Board
Fire Marshal, who may be permitted to enter during reasonable
business hours to inspect your gas industry to assure the safety of
2. An individual the public?
certified as
competent by the South Carolina's laws regarding the retail sale of propane to the
Division of State public require that the seller have a license from the LP Gas Board
Fire Marshal and...?
3. Not to exceed 6
According to the National Fire Protection Association Pamphlet
(NFPA) #58,
months from the date what is the limit on a temporary installation?
of installation
4. 1.0 lbs. per 10,000 gal- The ratio of Ethyl Mercaptan per 10,000 gallons of LP Gas by
test shall be
lons of LP-Gas how many lbs. per gallon?
5. U.S. Department DOT containers shall be designed, fabricated, tested, and marked (or
of stamped) in accordance with which organization?
Transportation
6. 120,000 water gallons Containers for general use shall not have individual water
capacities greater
than how many gallons?
7. 30,000 water gallons Service station containers shall not have individual capacities
greater than
how many gallons?
8. Bathroom NFPA pamphlet #54 states that unvented space heaters are not to
1/
17
,SC LP Gas Reseller Exam: Practice Test well
answered already passed
be
installed in which area?
9. NFPA #58 as When LP-Gas and other compressed gases are to be stored in the
adopted by the LP
same area, the containers shall be marked according to which
Gas Board
regulatory agency?
10. Cast Iron What material may NOT be used under service conditions for
container
appurtenances for LP Gas?
2/
17
, SC LP Gas Reseller Exam: Practice Test well
answered already passed
11. 250 PSIG Container appurtenances shall have a rated working pressure of at
least
what PSIG?
12. 12 years from All industrial trucks, including fork lift containers in use shall have the
man- ufacture pressure relief valve replaced at what interval?
date and every 10
years there- after
13. 60 drill size opening Excess flow valves shall be designed to close automatically at the
rated flow
of vapor or liquid specified by the manufacturer. Valves shall be
designed with a bypass, not to exceed what size drill opening?
14. To indicate the What is the purpose of a fixed liquid level gauge on containers to
maxi- mum filling
be filled by volume?
level
Pressure gauges shall be installed in what part of a LP Gas
15. Container
System used in a bulk plant?
opening or to a
valve or fitting
which is attached
di- rectly to
container
16. 350 PSIG Fittings used at pressures higher than container pressure on the
discharge
of the liquid transfer pump shall be suitable for a working pressure
of at least how much PSIG?
17. 250 PSIG Fittings used with liquid LP Gas or with vapor LP Gas at operating
pressures
over 125 PSIG shall have a working pressures of what PSIG?
3/
17