Prior to disposing of waste on a job site what should the installer
confirm first?
a.Where to dispose of cardboard
b.Is there a dedicated laborer to dispose of debris from the work site
c. Where the dumpster is located
d. Whether the general contractor has a dumpster onsite - ANSWERS-
b.Is there a dedicated laborer to dispose of debris from the work site
What document is used to account for lost time due to other trades
during a project
a. Punch list
b. Daily Progress report
c. RFI
d. Submittals - ANSWERS-b. Daily Progress report
The original LCD monitor specified on the project was not available.
The model used to replace it has a lower native resolution than the
original monitor. What device could be used to keep the EDID table
from now calculating the EDID table to a lower resolution for the whole
system?
a. Scan Converter
END OF
PAGE
1
, CTS-I EXAM LATEST
b. Scaler
c. Transcoder
d. EDID emulator - ANSWERS-b. Scaler
There is a conflict between the wall plate height specified in AV
documents and the height the electrical contractor is saying must be used
on site. Which of the following forms would be used by the integrator to
seek clarification of the correct mounting height of wall plates?
a. Construction Change Directive (CCD)
b. Request for Information (RFI)
c. Request for Change (RFC)
d. Change Order (CO) - ANSWERS-b. Request for Information (RFI)
What devices can interfere with DECT 6.0 wireless microphones?
a. Laptops with Wireless network cards
b. Cordless phones and headsets
c. Wireless routers
d. Bluetooth devices - ANSWERS-b. Cordless phones and headsets