California UST Service Technician part 1
Questions with Detailed Verified Answers
Q: July 1 2005, service techs shall possess or work under someone
who has a current certification indicating he or she has passed the
?
Ans: California UST service technician examzICC cert must be
renewed every?
Ans: axwrt24 monthszService techs must posses or be employed by a
person who has the appropriate contractors license unless?
Ans: axwrtThe individual has a Tank testing licenszService tech is
defined by any individual who?
Ans: axwrtTest UST monitoring equipment
Trouble shoots UST systems
Installs UST monitoring equipmentzIf the manufacturer training no
longer exist , the local angency may?
Ans: axwrtApprove comparable alternat training .zUST includes?
Ans: axwrtTank and connected pipingzWhat is considered and UST
Ans: axwrtpetroleum storage tankzWhat UST system meets the
requirements for secondary containment?
Ans: axwrtDoubled wall tankszAccording to title 23; the following
piping components if installed after July 1 1987 must have secondary
containment
, Page | 2
Ans: axwrtPressured product pipingzConsidered "pipe" on tanks
installed after July 1 2003
Ans: axwrtPressured product piping and below ground vapor
recoveryzUnder dispenser containment (UDC) was required for all UST
systems by
Ans: axwrtDecember 31 2003zSystem for exchanging gas vapors in
a storage tank and product in a fuel delivery truck
Ans: axwrtStage 1 vapor recoveryzAn approved method for non
visual monitoring for existing UST systems.
Ans: axwrtStatistical Inventory Reconciliation (SIR)zATG must be
capable for detecting a release of ?
Ans: axwrt.2 gallons per hourzManual inventory reconciliation.
Ans: axwrtNo longer an approved method for non visual monitoring
on existing UST systemszAutomatic line leak detectors installed on
underground piping with secondary containment shall be capable of
tetecting a leak of ?
Ans: axwrt3 gallons per hour at 10 psizATG should be programmed
to test the tank ?
Ans: axwrtAt least monthlyzAccording to PEI RP 300 a combustible
gas can be used to ?
Ans: axwrtDetect vapor leaks in a vapor recovery system.zAccording
to PEI RP 300. A written scope of work for vapor recovery installation
should include?
Ans: axwrtConstruction planszPositive shut off overfill protection
device must stop the flow of fuel when the tank is no more then ?
Ans: axwrt95% fullzAccording to EO VR 201 A What could cause a
nole shut off mechanism or malfunction?