Before new equipment arrives at the plant, plans for installing it are made by the
• Equipment manufacturer
• Maintenance supervisor
• Plant engineer
• Plant superintendent - (answer)• Plant engineer
When pouring a concrete footing, you should hold the steel rods in position with
• metal clips.
• tack welding
• tie wires
• wooden braces - (answer)• tie wires
The type of bolt to anchor the equipment is usually specified by the
• equipment manufacturer
• maintenance department.
• plant engineer
• plot plan - (answer)• equipment manufacturer
To isolate anchor bolts when mounting equipment on pads, surround the bolts with
• coil springs
• neoprene tubing
• plastic sleeves
• steel bushings - (answer)• neoprene tubing
To drill anchor bolt holes larger than 1^1/_2 in., you should use a
• Core bit with a diamond or carbon tip
• high-speed steel drill
, TPC 319 QUESTIONS WITH 100% CORRECT ANS!!
• solid carbon-tipped bit
• tool steel drilli - (answer)• Core bit with a diamond or carbon tip
Which of the following should be used to set equipment anchor bolts in an existing foundation?
• Coarse concrete
• Fine concrete
• Grout
• Mortar - (answer)Grout
Grout must be used within________of mixing
• 15 min
• 1 hr
• 2 hr
• 4 hr - (answer)• 15 min
To smooth an exposed area of grout, you should
• apply carborundum grit
• cover it with mortar
• paint it
• sand it - (answer)• cover it with mortar
What must you do first before disconnecting the electrical wiring to existing equipment?
• Check the line voltage.
• Open the switch box
• Shut off the power.
• Tape the exposed wire ends - (answer)• Shut off the power.