OREGON BOILERS EXAM || NEWEST ACTUAL QUESTIONS WITH COMPLETE QUESTIONS AND VERIFIED ANSWERS || GRADED A+ Doubling the pipe size increases the pipe capacity by - Correct Answer 4 times What is the purpose of post weld heat-treating steel pipe? - Correct Answer A- prevent over stressing of the weld. In ASTM A-53F pipe what does the letter F designate? - Correct Answer Furnace butt weld pipe What is the max weld reinforcement allowed by ASME B31.