Cijfer
A+
Geüpload op
08-09-2025
Geschreven in
2025/2026

ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions & Answers | 100% Verified solutions |Questions with Correct Answers 2025 latest update!!

Instelling
ACI- Concrete Field-Testing Technician - Grade 1
Vak
ACI- Concrete Field-Testing Technician - Grade 1

Voorbeeld van de inhoud

9/8/25, 7:15 AM ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions & Answers | 100% Verified solutions |Questions with Correct Ans…




ACI- Concrete Field-Testing Technician - Grade 1
Exam Questions & Answers | 100% Verified
solutions |Questions with Correct Answers 2025
latest update!!

Save




Terms in this set (133)


Q1. Start molding B. False
specimens for strength
tests within 30 minutes ASTM C172 -Para (4.1.2) - Start molding.
after fabricating the specimens for strength tests within 15 min after
composite sample. fabricating the
composite sample.
A. True
B. False

Q2. The maximum B. False
allowable time between
obtaining the first and last ASTM C172 - Para (4.1)- The elapsed time shall not
portions of the composite exceed 15 min. between obtaining the first and final
sample may not exceed 5 portions of the composite sample.
minutes.


A. True
B. False




https://quizlet.com/1072979930/aci-concrete-field-testing-technician-grade-1-exam-questions-answers-100-verified-solutions-questions-with-correct-a… 1/38

,9/8/25, 7:15 AM ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions & Answers | 100% Verified solutions |Questions with Correct Ans…


Q3. The composite A. True
concrete sample must be
protected from sun, wind, ASTM C172 - Para (4.1.2)
contamination and rapid
evaporation.


A. True
B. False

Q4. If the concrete A. True
contains aggregates
larger than those that are ASTM C172- Para (6.1)
appropriate for a size of
mold or equipment used,
the sample should be wet
sieved before making the
test.


A. True
B. False

Q5. The composite sample B. False
should not be remixed
before beginning any ASTM C172-Para (4.1.1) -The sample shall be combined
tests. and remixed with a shovel the minimum amount
necessary to ensure uniformity and compliance with
A. True the maximum time limits
B. False




https://quizlet.com/1072979930/aci-concrete-field-testing-technician-grade-1-exam-questions-answers-100-verified-solutions-questions-with-correct-a… 2/38

,9/8/25, 7:15 AM ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions & Answers | 100% Verified solutions |Questions with Correct Ans…


B. False

Q6. Sampling should
ASTM C172-Para (5). NOTE 2—Sampling should
normally be performed, as
normally be performed as the concrete is delivered
the concrete is discharged
from the mixer.
from the mixer.

To the conveying vehicle used to transport the
A. True
concrete to the forms; however, specifications may
B. False
require other points of sampling, such as the
discharge of a concrete pump.

Q7. ASTM Method C172 A. True
includes sampling from
stationary mixers, paving ASTM C172- Para (1.1)
mixers, truck mixers,
agitators, and non-
agitating equipment.


A. True
B. False

Q8. After sampling is D. None of the above
completed, start the tests
for slump and air content ASTM C172- Para (4.1.2) Start tests for slump,
within: temperature, and air content within 5 min after
obtaining the final portion of the composite sample.
A. 2 ½ minutes
B. 10 minutes
C. 15 minutes
D. None of the above




https://quizlet.com/1072979930/aci-concrete-field-testing-technician-grade-1-exam-questions-answers-100-verified-solutions-questions-with-correct-a… 3/38

, 9/8/25, 7:15 AM ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions & Answers | 100% Verified solutions |Questions with Correct Ans…


Q9. In any case, do not A. All the water and admixtures have been added to
obtain samples until: the concrete.


A. All the water and ASTM C172- Para (5.2.3). In any case do not obtain
admixtures have been samples until after all of the water has been added to
added to the concrete the mixer.
B. 200 revolutions of the
drum have been obtained
C. ½ of the water has been
added
D. None of the above

A. 10% or after 90%

Q10. No samples shall be
ASTM C172- Para (5.2.1).
taken before_________ or
after_________ of the batch
NOTE 3—No samples should be taken before 10 % or
has been discharged.
after 90 % of the batch has been discharged.

A. 10% or after 90%
Due to the difficulty of determining the actual quantity
B. 20% or after 90%
of concrete discharged, the intent is to provide
C. 20% or after 80%
samples that are representative of widely separated
D. None of the above
portions, but not the beginning and the end of the
load.

Q11. When strength tests B. 1 cubic foot
are to be made, the
minimum size of the ASTM C172- Para (5.1).
composite sample shall
be: Make the samples to be used for strength tests a
minimum of 28 L (1 ft3).
A. ¼ cubic foot
B. 1 cubic foot
C. Any convenient size
D. 1 Wheelbarrow




https://quizlet.com/1072979930/aci-concrete-field-testing-technician-grade-1-exam-questions-answers-100-verified-solutions-questions-with-correct-a… 4/38

Geschreven voor

Instelling
ACI- Concrete Field-Testing Technician - Grade 1
Vak
ACI- Concrete Field-Testing Technician - Grade 1

Documentinformatie

Geüpload op
8 september 2025
Aantal pagina's
38
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
CodedNurse Nightingale College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
3883
Lid sinds
1 jaar
Aantal volgers
24
Documenten
10001
Laatst verkocht
4 dagen geleden
coded

"I specialize in key academic areas such as Psychology, Nursing, Human Resource Management, and Mathematics. Providing students with top-quality work is my priority, and I always uphold the highest scholarly standards. This commitment has earned me the distinction of being a Gold-Rated Tutor on Stuvia. You can trust my work to help you achieve excellent grades!"

3.5

80 beoordelingen

5
29
4
15
3
19
2
4
1
13

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen