On a service can we install a meter with load present ? - (answer)No
Is special precautions part of a tailboard / job briefing ? - (answer)Yes
When can tools be modified ? - (answer)Never
How often do you inspect your rubber gloves and sleeves ? - (answer)Before each use
On a viper recloser what does single phase trip , single phase lockout mean ? - (answer)Only the phase
that is faulted will trip and recloser will only lockout that phase .
What is the wench capacity shown on this load chart ? - (answer)15000 lbs
Where would the service neutral connection be made on wye / wye 120/208 bank ? - (answer)Directly
to the secondary ground bus
When facing the secondary side of an additive polarity transformer , what side is the XI bushing on? -
(answer)Right
Can we run a service over a pool ? - (answer)No
What is the minimun length gaffs can be ? - (answer)1.25 in
What is the minimum distance from a building that a padmount transformer 75kva or less can be
located ? - (answer)3 ft
How close can you get to energized primary voltage before gloves and sleeves are required ? - (answer)5
ft
, CLASS A LINEMAN TEST 2025 QUESTIONS & ANSWERS SOLVED 100% CORRECT!!
What information can you find on a transformer name plate ? - (answer)weight
polarity
gallons of oil
manufacturer
When installing a service what connection is made first ? - (answer)Neutral
How do you make a capacitor safe for storage ? - (answer)Shunt it out
What is considered minimum primary voltage ? - (answer)600 volts
What is the maximum depth of an excavations without the use of shoring ? - (answer)5 ft
What is the minimum height from ground for a residential overhead service to be attached ? -
(answer)12 ft
When performing single phase switching what should be disabled on all upstream reclosers / breakers ?
- (answer)Ground tripping
How often should fall protection and climbing equipment be inspected ? - (answer)Before each use
When working near energized lines , how close can you work without covering the primary ? -
(answer)2'2 "
What is the formula for figuring out the KW on transformer ? - (answer)AMPS x Volts / 1000
Do we do a continuity check on the bottow side of the meter base before setting meter ? - (answer)Yes