Once a repair is completed, technicians must ___. -CORRECTANSWER Carefully
record the problem, causes, and solutions
___ maintenance is scheduled work required to keep equipment in peak operating
condition. -CORRECTANSWER Preventive
___ maintenance is performed to minimize emergency work and ensure reliable and
efficient operations. -CORRECTANSWER Scheduled
A ___ is a document that details specific maintenance tasks to be completed. -
CORRECTANSWER Work order
The ___ is a federal government regulatory agency that requires all employers to
provide a safe working environment for their employees. -CORRECTANSWER
Occupational Safety and Health Administration (OSHA)
Fall protection equipment is required when working in elevated spaces (over ___' above
the ground) or confined spaces. -CORRECTANSWER 6
, A ___ does not prevent the start up of equipment, but it serves as a warning to
operating and service personnel. -CORRECTANSWER Tagout
NFPA 704, Standard system for the identification of the hazards of materials for
emergency response, uses a ___ -color diamond design to display basic information
about hazardous materials. -CORRECTANSWER Four
___ diagrams resemble a ladder, so they are also known as ladder diagrams. -
CORRECTANSWER Line
Updates to an operator's manual may be distributed as ___. -CORRECTANSWER
Service bulletins
Force can be measured in ___. -CORRECTANSWER Pounds
On the Celsius scale, ___ C is the freezing point. -CORRECTANSWER 0
___ keys are used for transmitting heavy torques in shafts and hubs that are reversed
frequently and subject to vibration. -CORRECTANSWER Taper
___ are used to seal close-fitting pieces of metal such as parts of an engine or pipe
flanges. -CORRECTANSWER Gaskets
QUESTIONS WITH 100% PASSED ANSWERS|| LATEST
UPDATE 2025/26
Once a repair is completed, technicians must ___. -CORRECTANSWER Carefully
record the problem, causes, and solutions
___ maintenance is scheduled work required to keep equipment in peak operating
condition. -CORRECTANSWER Preventive
___ maintenance is performed to minimize emergency work and ensure reliable and
efficient operations. -CORRECTANSWER Scheduled
A ___ is a document that details specific maintenance tasks to be completed. -
CORRECTANSWER Work order
The ___ is a federal government regulatory agency that requires all employers to
provide a safe working environment for their employees. -CORRECTANSWER
Occupational Safety and Health Administration (OSHA)
Fall protection equipment is required when working in elevated spaces (over ___' above
the ground) or confined spaces. -CORRECTANSWER 6
, A ___ does not prevent the start up of equipment, but it serves as a warning to
operating and service personnel. -CORRECTANSWER Tagout
NFPA 704, Standard system for the identification of the hazards of materials for
emergency response, uses a ___ -color diamond design to display basic information
about hazardous materials. -CORRECTANSWER Four
___ diagrams resemble a ladder, so they are also known as ladder diagrams. -
CORRECTANSWER Line
Updates to an operator's manual may be distributed as ___. -CORRECTANSWER
Service bulletins
Force can be measured in ___. -CORRECTANSWER Pounds
On the Celsius scale, ___ C is the freezing point. -CORRECTANSWER 0
___ keys are used for transmitting heavy torques in shafts and hubs that are reversed
frequently and subject to vibration. -CORRECTANSWER Taper
___ are used to seal close-fitting pieces of metal such as parts of an engine or pipe
flanges. -CORRECTANSWER Gaskets