Page | 1
A220 ELECTRICAL Questions with Detailed
Verified Answers
Question: How many TRUs are there and how many Amps is each
Transformer Rectifier Unit (TRU) rated at?
Ans✅ ✅: 3 TRUs
TRU1: 350 Amps
TRU2: 350 Amps
TRU3: 225 Amps (additional 125 Amps dedicated to FBWPC)
Question: What do the TRUs do?
Ans✅ ✅: 3 TRUs are the primary source of DC power. They receive 115Vac and
convert it to 28Vdc and distribute to DC Buses.
Question: How many batteries do we have on the aircraft?
Ans✅ ✅: 2 NiCad Batteries
24Vdc and each rated at 42 ampere-hours
Question: Do you need batteries to start the APU?
Ans✅ ✅: Both batteries are needed for APU start if external power is not available.
BATT 1=APU ECU
BATT 2=APU Starter
Question: When will the BATT DISCHARGING caution message display
on the EICAS?
, Page | 2
Ans✅ ✅: When only the batteries supply power for more than 5 minutes
Also, a horn will sound until AC power is available or batteries are turned off.
Question: What DC buses do not show on the ELEC synoptic page?
Ans✅ ✅: BATT DIR 1
BATT DIR 2
DC EMER bus (only shows on ELEC synoptic page when not powered. (receives power
from both batteries)
Question: What are the 4 possible sources of AC power for the aircraft
(ground and flight)?
Ans✅ ✅: VFGs (L GEN and R GEN)
APU
EXTERNAL AC POWER
RAT
Question: What is the AC bus priority ?
Ans✅ ✅: AC BUS 1 = L GEN, EXT PWR, APU then R GEN
AC BUS 2 = R GEN, APU, EXT PWR then L GEN
Question: What is the maximum altitude for APU generator use?
Ans✅ ✅: 41,000'
Question: What is the maximum load on the AC generators?
Ans✅ ✅: 75kVA continuous
Question: What is available on the A220 to provice emergency AC
power?
A220 ELECTRICAL Questions with Detailed
Verified Answers
Question: How many TRUs are there and how many Amps is each
Transformer Rectifier Unit (TRU) rated at?
Ans✅ ✅: 3 TRUs
TRU1: 350 Amps
TRU2: 350 Amps
TRU3: 225 Amps (additional 125 Amps dedicated to FBWPC)
Question: What do the TRUs do?
Ans✅ ✅: 3 TRUs are the primary source of DC power. They receive 115Vac and
convert it to 28Vdc and distribute to DC Buses.
Question: How many batteries do we have on the aircraft?
Ans✅ ✅: 2 NiCad Batteries
24Vdc and each rated at 42 ampere-hours
Question: Do you need batteries to start the APU?
Ans✅ ✅: Both batteries are needed for APU start if external power is not available.
BATT 1=APU ECU
BATT 2=APU Starter
Question: When will the BATT DISCHARGING caution message display
on the EICAS?
, Page | 2
Ans✅ ✅: When only the batteries supply power for more than 5 minutes
Also, a horn will sound until AC power is available or batteries are turned off.
Question: What DC buses do not show on the ELEC synoptic page?
Ans✅ ✅: BATT DIR 1
BATT DIR 2
DC EMER bus (only shows on ELEC synoptic page when not powered. (receives power
from both batteries)
Question: What are the 4 possible sources of AC power for the aircraft
(ground and flight)?
Ans✅ ✅: VFGs (L GEN and R GEN)
APU
EXTERNAL AC POWER
RAT
Question: What is the AC bus priority ?
Ans✅ ✅: AC BUS 1 = L GEN, EXT PWR, APU then R GEN
AC BUS 2 = R GEN, APU, EXT PWR then L GEN
Question: What is the maximum altitude for APU generator use?
Ans✅ ✅: 41,000'
Question: What is the maximum load on the AC generators?
Ans✅ ✅: 75kVA continuous
Question: What is available on the A220 to provice emergency AC
power?