Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

FULL CHAPTERS TESTBANK FOR Electrical Wiring Commercial Textbook 9th Edition MulliN TESTBANK

Rating
-
Sold
-
Pages
103
Grade
A+
Uploaded on
17-09-2025
Written in
2025/2026

FULL CHAPTERS TESTBANK FOR Electrical Wiring Commercial Textbook 9th Edition MulliN TESTBANK

Institution
Course

Content preview

, TESTBANK FOR Electrical Wiring Commercial
Textbook 9th Edition Ray C. Mullin
Notes
1- The file is chapter after chapter.
2- We have shown you few pages sample.
3- The file contains all Appendix and Excel sheet
if it exists.
4- We have all what you need, we make update
at every time. There are many new editions
waiting you.
5- If you think you purchased the wrong file You
can contact us at every time, we can replace it
with true one.
Our email:


,Name: Class: Date:

Unit 1 - Commercial Building Plans and Specifications
1. What percentage of the contract price is normally made up by performance bond?
a. 25% b. 50%
c. 100% d. 200%

ANSWER: c

2. What is the name given to the brief description of the project and its location?
a. proposal b. notice to bidder
c. instruction to bidder d. addendum

ANSWER: c

3. Which term refers to the document that outlines modifications made to the contract documents before
bidding closes?
a. surety bond b. specification
c. change order d. addendum

ANSWER: d

4. What is the specification division number for electrical work?
a. 11 b. 23
c. 26 d. 48

ANSWER: c

5. On what drawing will you find the dimensions of the lot?
a. site plan b. elevation
c. floor plan d. section

ANSWER: a

6. What drawing shows the vertical faces of a building?
a. floor plan b. elevation
c. section d. site plan

ANSWER: b

7. What type of scale is used for a drawing that is measured in feet and inches?
a. engineering b. imperial
c. metric d. architectural

ANSWER: d

8. If told to look for a drawing marked B-B, what type of drawing are you looking at?
a. legend of symbols b. details drawing
c. architectural drawing d. elevation drawing

ANSWER: b

9. According to the Supplementary General Conditions, who is responsible for any utilities that are
damaged?

Copyright Cengage Learning. Powered by Cognero. Page 1

,Name: Class: Date:

Unit 1 - Commercial Building Plans and Specifications
a. the contractor b. the municipal government
c. the crew d. the site owner

ANSWER: a

10. What is the specification division number for equipment work?
a. 11 b. 23
c. 26 d. 48

ANSWER: a

11. Which term is often used for the construction plans for a building?
a. shop drawings b. architecturals
c. blueprints d. plots

ANSWER: b

12. Which drawing is the architectural floor plan for the basement?
a. A1 b. A2
c. A3 d. A4

ANSWER: b

13. On which drawing would you find the legend for electrical symbols?
a. A1 b. E1
c. E2 d. E3

ANSWER: b

14. Which document is required to fix errors in the drawings that are noticed after the job has been
awarded?
a. change order b. addendum
c. alternate d. proposal

ANSWER: a

15. Besides the CSA, which organization is accredited to provide approval of electrical equipment in
Canada?
a. NSC b. CEC
c. ULC d. SCC

ANSWER: c

16. When was the first edition of the Canadian Electrical Code finalized?
a. 1927 b. 1930
c. 1955 d. 1966

ANSWER: a

17. What is the multiplier provided in the CEC for converting metres to feet?
a. 0.621 b. 2.205

Copyright Cengage Learning. Powered by Cognero. Page 2

,Name: Class: Date:

Unit 1 - Commercial Building Plans and Specifications
c. 3.281 d. 10.764

ANSWER: c

18. How often is the CEC updated?
a. every year b. every two years
c. every three years d. every five years

ANSWER: c

19. What is the metric designator for a raceway of trade size 2"?
a. 21 mm b. 41 mm
c. 53 mm d. 78 mm

ANSWER: c

20. In the metric system, what is the prefix for 1 000 000?
a. giga- b. centi-
c. mega- d. kilo-

ANSWER: c

21. Which term in the CEC is used to indicate a mandatory requirement?
a. approved b. may
c. shall d. practicable

ANSWER: c

22. How many pounds are there in one kilogram?
a. 0.7376 b. 1.0
c. 2.205 d. 3.0

ANSWER: c

23. What is the unit symbol for millimetres?
a. mm b. cm
c. m d. km

ANSWER: a

24. What does the word kilo- mean in SI prefixes?
a. one-tenth b. ten
c. one thousand d. one million

ANSWER: c

25. What size is a 3/4 conduit in metric?
a. 12 mm b. 16 mm
c. 21 mm d. 27 mm

ANSWER: c

Copyright Cengage Learning. Powered by Cognero. Page 3

,Name: Class: Date:

Unit 1 - Commercial Building Plans and Specifications
26. What is the unit symbol for ohms?
a. ? b. O
c. µF d. km

ANSWER: a

27. According to the job specifications, who is responsible for installing the commercial building’s
primary service and transformer?
a. the municipal government b. the electrical contractor
c. the supply authority d. the site owner

ANSWER: c

28. Whose responsibility is it to obtain the electrical permit?
a. the electrical contractor b. the municipal government
c. the crew d. the site owner

ANSWER: a

29. On Drawing E3, the measurement of the drug store’s track lighting is 89 mm. What is the track’s
actual length?
a. 0.89 m b. 4.4 m
c. 8.9 m d. 17.8 m

ANSWER: b

30. What does the “instruction to bidders” document encompass?
ANSWER: This section provides the contractor with a brief description of the project, its location, and
how the job is to be bid (lump sum, one contract, or separate contracts for the various
construction trades, such as plumbing, heating, electrical, and general). In addition, bidders
are told where and how the plans and specifications can be obtained prior to the preparation of
the bid, how to make out the proposal form, where and when to deliver the proposal, the
amount of any bid deposits required, any performance bonds required, and bidders’
qualifications. Other specific instructions may be given, depending upon the job.

31. What is involved when estimating an electrical project?
ANSWER: The main steps in estimating include the following:

Preparing a material take-off involves counting, measuring, and listing the quantities of
materials and equipment required to complete the installation. This is often done in a way that
will allow easy assignment of labour units.

Tabulating and pricing is the process of assigning labour units and prices for everything on the
material list. Standard labour units are used for this, as found in various estimating manuals.

Summarizing the total projected costs means putting together the costs of material, labour, job
factors (such as working heights, multiple buildings), direct job expenses (such as equipment,
travel and warehousing), overhead, and profit.

32. What is the purpose of the CEC, and how is it applied in each province and city?
ANSWER: As outlined in CEC Section 0, Object, the purpose of the code is to establish safety standards
for the installation and maintenance of electrical equipment. In its preparation, consideration
has been given to the prevention of fire and shock hazards, as well as proper maintenance and
Copyright Cengage Learning. Powered by Cognero. Page 4

,Name: Class: Date:

Unit 1 - Commercial Building Plans and Specifications
operation. The CEC is the basic standard for the installation and construction of all electrical
systems in Canada. However, some provincial and local codes contain specific amendments
that must be adhered to in all electrical wiring installations under their jurisdiction.

33. The CEC definition for the term accessible may refer to either equipment or wiring methods. Explain
the difference.
ANSWER: Referring to Section 0, Definitions,
Accessible (as applied to equipment) means admitting close approach because the equipment
is not protected by elevation, locked doors, or other means.

Accessible (as applied to wiring methods) means
(a) not permanently enclosed in the building structure or finish, or
(b) may be removed without disturbing the building structure or finish.

34. How are commas, periods, and spaces used to make long numbers easier to read?
ANSWER: In the United States, it is the practice to use a period as the decimal marker and a comma to
separate a string of numbers into groups of three for easier reading. In many other countries,
the comma is used as the decimal marker and spaces are used to separate a string of numbers
into groups of three. The SI system, taking something from both, uses the period as the
decimal marker and the space to separate a string of numbers into groups of three, starting
from the decimal point and counting in either direction, for example, 12 345.789 99. An
exception to this occurs when there are four numbers on either side of the decimal point. In
this case, the third and fourth numbers from the decimal point are not separated, for example,
2015.1415.




Copyright Cengage Learning. Powered by Cognero. Page 5

,Name: Class: Date:

Unit 2 - The Electric Service
1. Who buys the substation equipment for the building?
a. utility company b. building owner
c. electrical contractor d. general contractor

ANSWER: b

2. What size transformer provides the electrical power for the commercial building?
a. 100 kVa b. 350 kVA
c. 600 kVA d. 1000 kVA

ANSWER: b

3. What is secondary voltage rating for the commercial building’s pad-mounted transformer?
a. 120 V b. 120/208 V
c. 347 V d. 347/600 V

ANSWER: b

4. Today’s liquid-filled transformer windings are immersed in acceptable non-toxic liquids. What is one
of the main functions?
a. conducting electricity b. impedance
c. short-circuit protection d. cooling

ANSWER: d

5. What is the main advantage of dry-type transformers over comparably rated liquid-filled transformers?
a. They are lighter in weight. b. They do not require cooling.
c. The have better dielectrics. d. The have higher impedance.

ANSWER: a

6. What is the maximum overcurrent protection required for the secondary of a dry-type transformer
whose primary and secondary voltage are under 750 V, with secondary current of 300 A, and no
individual overcurrent protection on the primary?
a. 300 A b. 350 A
c. 375 A d. 400 A

ANSWER: b

7. Which connection scheme has the advantage of being able to provide either three-phase or three-phase
and single-phase power using only two transformers?
a. two-wire single-phase b. three-wire closed delta
c. three-wire open delta d. four-wire open wye

ANSWER: c

8. Which of the following established the regulations governing the method of bringing the electric power
into a building?
a. utility company b. building owner
c. electrical contractor d. general contractor


Copyright Cengage Learning. Powered by Cognero. Page 1

,Name: Class: Date:

Unit 2 - The Electric Service
ANSWER: a

9. What is one of the two basic methods of metering?
a. low-voltage metering b. pulsed metering
c. intermediate-voltage metering d. secondary high-voltage metering

ANSWER: a

10. Where are the meters installed in the commercial building?
a. panel socket b. transformer
c. feeder d. switchboard

ANSWER: d

11. Which of the following is NOT required when the transformer is installed at a location far from the
building?
a. service entrance conductors b. main switch or switches
c. grounding rods d. metering equipment

ANSWER: c

12. What size fuse is placed in the 200-ampere owner’s disconnect at the service-entrance equipment?
a. 100 amperes b. 150 amperes
c. 160 amperes d. 2000 amperes

ANSWER: b

13. What size are the conduits that carry the service entrance conductors?
a. 63 mm b. 78 mm
c. 91 mm d. 103 mm

ANSWER: d

14. How many 750 kcmil conductors go into each service-entrance conduit?
a. 1 b. 2
c. 3 d. 4

ANSWER: d

15. What is the maximum number of consumer services per building permitted by the CEC, unless special
permission is given?
a. 1 b. 2
c. 4 d. 10

ANSWER: c

16. How many consumer services are permitted by the CEC in one location?
a. 1 b. 2
c. 3 d. 4

ANSWER: d

Copyright Cengage Learning. Powered by Cognero. Page 2

, Name: Class: Date:

Unit 2 - The Electric Service

17. What common factor influences the size of the ground-fault current?
a. the magnetic permeability of the grounding path
b. the length of the grounding path
c. the impedance of the grounding path
d. the elevation of the grounding path

ANSWER: c

18. In a three-phase, four-wire electrical system, which conductor must be grounded?
a. line b. phase
c. grounding d. neutral

ANSWER: d

19. Which term refers to the conductor used to connect the service equipment to the grounding electrode?
a. bonding conductor b. grounding conductor
c. grounding electrode d. grounding

ANSWER: b

20. Which term refers to the conductor that connects the non-current-carrying parts of electrical
equipment to the service equipment or grounding conductor?
a. bonding conductor b. grounding conductor
c. grounding electrode d. grounding

ANSWER: a

21. What is the minimum distance that ground rods can be apart?
a. 1 m b. 2 m
c. 3 m d. 5 m

ANSWER: b

22. What is term when conductive parts are of equal electrical potential?
a. impedance ground system b. grounding conductor
c. grounding electrode d. equipotentiality

ANSWER: d

23. What size copper bonding jumper would be installed for a metal raceway containing 400 A
conductors?
a. No. 2 AWG b. No. 4 AWG
c. No. 6 AWG d. No. 8 AWG

ANSWER: b

24. What size copper bonding wire would be installed to bond a system whose phase conductors have an
ampacity rating of 125 A?
a. No. 4 AWG b. No. 6 AWG
c. No. 8 AWG d. No. 10 AWG
Copyright Cengage Learning. Powered by Cognero. Page 3

Written for

Course

Document information

Uploaded on
September 17, 2025
Number of pages
103
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$24.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
storetestbanks ball state university
Follow You need to be logged in order to follow users or courses
Sold
290
Member since
1 year
Number of followers
4
Documents
1891
Last sold
4 days ago

Welcome to my store! I provide high-quality study materials designed to help students succeed and achieve better results. All documents are carefully organized, clear, and easy to follow. ✔ Complete test banks & study guides ✔ All chapters included ✔ Accurate and reliable content ✔ Perfect for exam preparation My goal is to make studying easier and save your time by providing everything you need in one place. Feel free to explore my collection and choose what fits your needs. Thank you for your support!

Read more Read less
4.6

42 reviews

5
34
4
3
3
3
2
0
1
2

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions