Kentucky UST Certification Test Prep EXAM
(updated 2025) Questions & Answers | Latest
Already Graded A+ UPDATE 2025|2026
Save
Terms in this set (160)
1. when tanks arrive at the lifted off with a cable attached to the tank lifting lugs
job site, how should they
be unloaded?
As an alternative lifting No, Never!
method, should a cable or
chain be wrapped around
the tank?
When you are lifting a attach a triangle cable through the lugs with no more
tank, using the lifting lugs, than a 30 degree angle from the center line.
which of these procedures
should be followed?
After you unload a new Chock the tank to prevent it from Rolling
tank on a clean level
surface at the job site
what else should you do
prior to inspection and
pre-testing?
https://quizlet.com/1078564627/kentucky-ust-certification-test-prep-exam-updated-2025-questions-answers-latest-already-graded-a-update-2025202… 1/37
,9/18/25, 12:05 PM Kentucky UST Certification Test Prep EXAM (updated 2025) Questions & Answers | Latest Already Graded A+ UPDATE 2025|202…
which of the following Piping (steel and fiberglass)
items should be physically Fittings, Vents, Fillboxes, anodes, ECT..
checked for damage or The tanks themselves
imperfections at the job (ALL OF THE ABOVE)!
site?
STI-P3 tanks are delivered remove the plugs and replace them with a standard
with shipping plugs in tank threaded plug that is properly doped
openings. What should be
done to these plugs prior
to testing?
should dielectric bushings yes on all openings
be installed in all openings
of an STI-P3 tank?
what is the maximum air 5 pounds
pressure to which a steel
tank should be subjected
in a pre-installation test?
for fiberglass reinforced 3 pounds
plastic (FRP) tanks up to 12
feet in diameter what is an
acceptable air pressure to
which the tanks may be
subjected in a pre-
installation test?
for FRP tanks over 12 feet 3 pounds
in diameter what is the
maximum air pressure to
which the tanks should be
subjected in a pre-
installation test?
when you are conducting a pressure gauge with a maximum limit of 10 to 15
an air test on a tank the PSIG
type of gauge that should
be used is?
https://quizlet.com/1078564627/kentucky-ust-certification-test-prep-exam-updated-2025-questions-answers-latest-already-graded-a-update-2025202… 2/37
,9/18/25, 12:05 PM Kentucky UST Certification Test Prep EXAM (updated 2025) Questions & Answers | Latest Already Graded A+ UPDATE 2025|202…
the proper procedure for apply 3 to 5 pounds of pressure and soap all surfaces
conducting a pre- and weld seams visible through the coating while
installation air test of a inspecting for bubbles.
steel tank is to?
what is the proper apply 3 pounds of air pressure and soap all surfaces
procedure for conducting while inspecting for any sign of a leak either audible
a pre-installation air test of or visible in the form of bubbles on the surface
an FRP tank Under 12 feet
in diameter is to....
a double-walled steel tank requires air testing of the interstitial space prior to
build in accordance with installation
UL standard 58 is?
the proper procedure for pressurize the inner tank monitor the pressure for one
conducting a pre- hour and then pressurize the space between the inner
installation air test of a and outer tanks with the air from the inner tank
double-walled tank is to?
when shipped a steel tank should be touched up with a compatible coating after
is covered with a coating proper surface preparation
that is an important part of
the tanks Corrosion
Prevention system.
"holidays" which show up
in the coating at the
installation site should?
touch up of holidays in a according to the manufacturer's instructions
steel tank coatings at the
installation site should be
done.......
dielectric bushings are non-metallic material
usually made of what?
https://quizlet.com/1078564627/kentucky-ust-certification-test-prep-exam-updated-2025-questions-answers-latest-already-graded-a-update-2025202… 3/37
, 9/18/25, 12:05 PM Kentucky UST Certification Test Prep EXAM (updated 2025) Questions & Answers | Latest Already Graded A+ UPDATE 2025|202…
*the tank manufacturers recommendations
factors to consider in *the requirements for compacting bedding and
determining the size backfill as well as stability of the soil
shape and depth of a tank *the depth of cover
excavation include what?
AKA all of the above
in the absence of local 5 feet
requirements the
recommended minimum
distance between a tank
excavation and adjacent
structures or property
lines is how many feet?
reinforcement of a steel the burial depth is greater than the tank diameter
underground tank may be
required by the tank
manufacturer if
according to FRP tank 7 feet
manufacturers
specifications the burial
depth for an FRP tank
should not exceed how
many feet?
when installing a make sure the excavation is free from material that
cathodically protected could cause damage to the coating
steel tank you should
when installing dielectric make sure that no electric current can pass through
bushings in a cathodically the dielectric flanges or bushings
protected steel tank prior
to placing the tank in the
excavation you should