FDNYC F60 Fireguard Test EXAM Questions and
Answers (Verified Answers) (Latest Update 2025)
UPDATE!! F60 Fireguard test
Save
Terms in this set (27)
For hot work operation at least 48 hours before
with citywide permit, the
owner of the premises of
the hot work operation
areas must be notified in
writing by the citywide
permit holder ______ the hot
work is to be started.
The pre-hot work check least once per day.
must be conducted by the
responsible person before
hot work is authorized and
__________
The check reports must be 48 hours after work is complete.
kept at the work site
during the work, made
available for inspection by
a representative of the
FDNY, and maintained on
the premises for a
minimum of