QUESTIONS WITH ANSWERS |\ |\
Determining the ________ and a good estimate of the |\ |\ |\ |\ |\ |\ |\ |\ |\
volume of propane usage on a weekly basis will lead to a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
better dispenser design and installation while avoiding
|\ |\ |\ |\ |\ |\ |\
wasted time and expense that can arise out of poor pre
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
installation planning. |\
Size of the container to fill
|\ |\ |\ |\ |\
Selecting the proper size tank for the dispenser
|\ |\ |\ |\ |\ |\ |\ |\
installation for high volume installations is crucial for |\ |\ |\ |\ |\ |\ |\ |\
_____
Delivery Routing |\
NFPA 58 limits the maximum aggregate water capacity for
|\ |\ |\ |\ |\ |\ |\ |\
tanks supply dispensing stations not located in a bulk
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
plant or industrial plant to no more than ______ gallons.
|\ |\ |\ |\ |\ |\ |\ |\ |\
30,000
According to NFPA 58, vertical tanks shall be designed to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
be self-supporting without the use of guy wires and shall
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
be designed to withstand the _____ anticipated at the
|\ |\ |\ |\ |\ |\ |\ |\ |\
sites.
Wind, High Winds, and Seismic Forces
|\ |\ |\ |\ |\
One of the items required for compliance with NFPA 58
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
vertical tank installation provisions is?
|\ |\ |\ |\
Know your local conditions
|\ |\ |\
,The planning and installation of electrical service to a
|\ |\ |\ |\ |\ |\ |\ |\ |\
propane dispenser should be coordinated with the |\ |\ |\ |\ |\ |\ |\
installation site owner or operator and a? |\ |\ |\ |\ |\ |\
Licensed Electrician |\
The NFPA code that applies to propane dispensers located
|\ |\ |\ |\ |\ |\ |\ |\
at multiple fuel refueling stations is _____
|\ |\ |\ |\ |\ |\ |\
30A
The valves and fittings required by NFPA 58 for ASME
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
tanks typically used to supply propane dispensers include
|\ |\ |\ |\ |\ |\ |\
a double backflow check filler valve, a spring-type relief
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
valve, a fixed maximum liquid level gauge, and a _______
|\ |\ |\ |\ |\ |\ |\ |\ |\
Float Gauge |\
Two additional ASME tank fittings (devices) required for
|\ |\ |\ |\ |\ |\ |\ |\
ASME tanks a over 4,000 gallons water capacity that are
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
not required by NFPA 58 for ASME tanks typically used to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
supply propane dispenser are a ______ |\ |\ |\ |\ |\
Pressure gauge, Temperature gauge |\ |\ |\
An ASME tanks ______ is used to determine the discharge
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
capacity requirements for its relief valve(s) |\ |\ |\ |\ |\
Data Place |\
Means such as a _______ (designed to remain in place,
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
except during pressure relief device operation, and not
|\ |\ |\ |\ |\ |\ |\ |\
restrict pressure relief device flow) shall be provided to
|\ |\ |\ |\ |\ |\ |\ |\ |\
minimize the possibility of the entrance of water or other |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
extraneous matter into the tank's relief device or any |\ |\ |\ |\ |\ |\ |\ |\ |\
discharge piping. |\
Rain Cap |\
Dispenser supply tank over 4,000 gallons water capacity |\ |\ |\ |\ |\ |\ |\ |\
or having a filling opening ______ diameter or larger
|\ |\ |\ |\ |\ |\ |\ |\ |\
, require a transfer bulkhead equipped with an emergency
|\ |\ |\ |\ |\ |\ |\ |\
shutdown valve (ESV) for the vapor equalizing connection |\ |\ |\ |\ |\ |\ |\
(if 1 1/4 inch or larger), and an ESV for the liquid fill
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
connection. A backflow check valve may be used for the |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
liquid line if flow of liquid is limited to one direction (into
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the dispenser supply tank).
|\ |\ |\
1 1/2 inch
|\ |\
NFPA 58 allows for various materials and piping joints
|\ |\ |\ |\ |\ |\ |\ |\ |\
(threaded and welded) to be used in respect to liquid |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
piping in dispenser stations, one type of piping that
|\ |\ |\ |\ |\ |\ |\ |\ |\
cannot be used for liquid piping is _______
|\ |\ |\ |\ |\ |\ |\
Plastic
Propane dispenser electrical systems must conform to the
|\ |\ |\ |\ |\ |\ |\
provisions of NFPA 58, LP-Gas Code for ignition source
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
control and those of ______ for hazardous |\ |\ |\ |\ |\ |\
NFPA 70 |\
_______ in electrical area classifications are based upon the
|\ |\ |\ |\ |\ |\ |\ |\
likelihood of the presence of a flammable mixture of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
materials located in the area. |\ |\ |\ |\
Divisions
Which of these items is not a primary component of a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
dispenser electrical system? Sealing Fitting; Remote |\ |\ |\ |\ |\ |\
Shute off Switch; Explosion Proof Switch; Octagon
|\ |\ |\ |\ |\ |\ |\
Electrical Box |\
Octagon Electrical Box |\ |\
If no sealing fitting is provided at the boundary between
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
classified and non-classified areas, or if the lower portion
|\ |\ |\ |\ |\ |\ |\ |\ |\
of the fitting is not properly sealed with sealing
|\ |\ |\ |\ |\ |\ |\ |\ |\
compound, the entire system ______ as an explosion-proof |\ |\ |\ |\ |\ |\ |\ |\
system