Unit 614
Mock Exam Version A & B
Actual Questions and Revised Answers
100% Guarantee Pass
The City & Guilds 2365 Unit 614 Mock Exam A & B (2025) offers
a meticulously structured online resource designed
for learners preparing for the Level 2 and Level 3
Diploma in Electrical Installations (Buildings and
Structures). These mock exams are aligned with the
latest 2025 curriculum updates, providing
comprehensive question sets that mirror the official assessment
standards. With detailed marking schemes
, Table of Contents
2365 Unit 614 Mock Exam Version A......................2
2365 Unit 614 Mock Exam Version B.................... 18
2365 Unit 614 Mock Exam Version A
**State the purpose of initial verification (2 marks)**
- The purpose of initial verification is to confirm that a new electrical
installation or an alteration/addition complies with the requirements of BS
7671.
- It ensures that the installation is safe to use and free from defects before
being put into service.
---
**State the purpose of periodic inspection and testing (2
marks)**
- The purpose is to assess the continued safetỵ and condition of an existing
installation.