DELL CLIENT ADVANCED ACTUAL EXAM
QUESTIONS AND CORRECT DETAILED
ANSWERS
When the side cover of Precision Tower 7920 is not assembled, the system will
still power on. - (ANSWER)False
On Latitude 14 Rugged Extreme - 7414, which light is used to communicate error
using Single LED ? - (ANSWER)not Power light
We Import a Foreign configuration in a RAID Array, if: - (ANSWER)The array
containing foreign configuration is in an Offline state
Select statements that are true about Trusted Platform Module (TPM) -
(ANSWER)not The Trusted Platform Module (TPM) is used to generate and store
keys
After completing a service incident on a Precision Tower 7920, technician
attempts to run ePSA before re-assembling the side cover. However, system is not
able to power on and displays LED error code of 4-7. What could be the issue? -
(ANSWER)The intrusion switch is triggered and power is cut-off. Install the side
cover to de-activate the intrusion switch.
Before replacing any hardware, what is the recommended solution for the BSOD
or system freezing? - (ANSWER)not Reseat the DIMMs
, 2
If an Edge Gateway is Blinking green after the diagnostics, what does it indicate? -
(ANSWER)ePSA Pass
On a Precision Workstation, if a Hard drive status indicator flashes green, amber
and then turns off; this indicates the drive is rebuilding - (ANSWER)False
In general, an Anti-Static Mat is used to prevent Electrostatic damage -
(ANSWER)True
Onsite Services for Ruggedized Notebooks are limited to CRU parts and Service
Assembly Parts. - (ANSWER)True
How many thermal performance control modes are there in Alienware Area 51m
to support different user scenarios? - (ANSWER)not 1.0
Overclocking is the process of making a computer or component in a computer
operate faster than specified by the manufacturer by modifying the system
parameters - (ANSWER)True
In a PERC H730P controller, P stands for Performance - (ANSWER)True
iDRAC with Lifecycle Controller can be used for: - (ANSWER)not OS Deployment