NASLCA VIRGINIA EXAM PRACTICE PREPARATION NEWEST
2025/2026 COMPLETE 150 QUESTIONS AND CORRECT ANSWERS
(VERIFIED ANSWERS)|ALREADY GRADED A+
A contractor plans to use materials or methods other than those standard in the
industry. The contractor should
specifically state this in the agreement.
An owner hires a construction manager for a project. Which of the following is
TRUE with regard to subcontractors?
The subcontractors are prime contractors.
The three PRIMARY elements of a contract are
offer, acceptance, and consideration.
A contract refers to an insurance agreement that the contractor is REQUIRED to
have. This is considered
part of the contract.
What can be determined by summing the project activities into an overall
schedule?
The total resource demand for a project at any given time.
The PRIMARY difference between a project manager and a project superintendent
is that the project manager
1|Page
, NASLCA Virginia Exam Practice Preparation
does not directly supervise day-to-day field activities.
The BEST business practice for special-ordered materials is to
put the order requirements in writing.
An important factor in ensuring that a schedule is followed is to
make sure the superintendent agrees with it
Which of the following is considered ethical behavior?
Failing to disclose one subcontractor's bid to another.
All of the following are advantages of good scheduling EXCEPT
reduced training costs.
What can be used to collect information on labor, materials, equipment, and
overhead costs used during the performance of a job?
A job cost system.
What protects a contractor from risk?
Insurance
What type of insurance is needed for a partnership to insure that the business
does NOT go out of business if one partner dies?
Key man
2|Page
, NASLCA Virginia Exam Practice Preparation
What does a comprehensive general liability insurance policy protect a company
against?
An accident at the job site that damages the neighbor's house.
AT LEAST how often should employees watch for possible hazards at the jobsite?
Constantly
Medical records of work-related injuries to long-term employees MUST be kept for
a MINIMUM of what duration after the employee leaves employment?
30 years.
Records of an employee's exposure to hazardous materials MUST be kept a
MINIMUM of how many years?
30 years.
What type of material at a construction site may be considered hazardous waste?
Cleaning supplies.
Approximately how many materials are currently on the EPA hazardous materials
list?
500
At LEAST how often MUST an employer report information on the number of
employees and the number of new hires in order to meet the requirements of the
Child Support Enforcement Act?
Every 2 months
What is the MAXIMUM penalty for a contractor who undertakes work without the
proper class of license?
$500 fine per day for each day of violation plus penalties for a misdemeanor.
All Class A contractor licensure applications MUST include
information on the knowledge, skills, and abilities of the applicant.