\.4 factors influencing erosion - Answer- climate
groundcover (influenced by humans)
soil properties
topography (influenced by humans)
\.county use bonds - Answer- returned within 60 days of adequate stabilization
can't be more than 25% of estimated cost
to cover expenses should the applicant fail conservation action
\.Describe MS-19 after July 1, 2014 - Answer- Requires management of post-development
SW runoff if not under SW program
-If SW into a natural channel, then achieve energy balance
-If into a manmade channel, EB or max 2-yr storm discharge
-If into restored channel, EB or peak discharge is designed parameters
\.Erosion Impact Area - Answer- area of land NOT ASSOCIATED with a current land- disturbing
activity but contributing to sedimentation
, \.How are you eligible to take the exam? - Answer- Take a DEQ training class OR DEQ 800
hour work experience form
\.How is a slope percentage calculated? - Answer- rise/run
horizontal distance / vertical distance
closer number to 1 in a ratio= higher percentage=steeper slope
\.How is a stop-work order issued? (3 scenarios) - Answer- 1. NOC measures are not done by
deadline, then issue SWO on all or part. 7 days, or sooner if corrected.
2. no plan/permits, mail and post on site
3. emergency- no NOC required.
\.How many days to remove temporary controls after final site stabilization? (MS-18) - Answer-
30 days
\.How many ft of utility can be open at a time? (MS-16) - Answer- 500 linear ft of a utility
trench
\.How much extra mesh is required at an inlet? - Answer- 12 inches
\.How much more soil loss occurs from construction sites versus natural soil erosion rates?
Agricultural land? - Answer- 1000 times more than the average natural soil erosion rate.
20 times more than agricultural land.
\.If dormant for more than 14 days, how many days to seed? - Answer- 7 days for temp
vegetation (permanent vegetation if dormant for >1 year)