HIC EXAM WITH COMPLETE
SOLUTIONS
Nailing into hard wood, whats best to use ? -ANSCut na
To avoid hardening due to hydration ....use masonry mo before? -ANS2 1/2 Hours
Heat flows in what direction ? -ANSHot to Cold
First and most important step in using or preparing a material ? -ANSThoroughly read
and understand the manufactures directions .
whats true abou the gypsum broads over wood framing ? -ANSApply First to ceiling ,
then to wall
What is used to remove air pockets from place concrete ? -ANSVibration
wide square-edged boards are to be used for broad and batt siding . how should the
batten strips be nailed ? -ANSto the furring strips between the boards .
what can be installed on a vertical wall to accept viny soppit panels ? -ANSF-Channel
a vapor retarder on blanket insulation -ANSFace the warm side of wall
when installing shoe molding on a base board over hand wood floor , the shoe mold
should be ? -ANSnailed only to the base board
to facilitate handling + workability ... must speak jobsite addition of water to the concrete
mixture -ANSmaintain the slump, without exceeding the allow water - cement ratio .
Actual standard size of a concrete block ? -ANS7 5/8 x 7 5/8 x 15 5/8
Maximum threshold height of egress door , of group occupancy building ? -ANS1/2 inch
First leveling procedure after pouring concrete ? -ANSscreeding
timing for floating+ trouling is critical inproduce -ANSa smooth durable surface
when applying a run of wall cabinets , the cabinets should be? -ANSfitted with a hanger
rail
SOLUTIONS
Nailing into hard wood, whats best to use ? -ANSCut na
To avoid hardening due to hydration ....use masonry mo before? -ANS2 1/2 Hours
Heat flows in what direction ? -ANSHot to Cold
First and most important step in using or preparing a material ? -ANSThoroughly read
and understand the manufactures directions .
whats true abou the gypsum broads over wood framing ? -ANSApply First to ceiling ,
then to wall
What is used to remove air pockets from place concrete ? -ANSVibration
wide square-edged boards are to be used for broad and batt siding . how should the
batten strips be nailed ? -ANSto the furring strips between the boards .
what can be installed on a vertical wall to accept viny soppit panels ? -ANSF-Channel
a vapor retarder on blanket insulation -ANSFace the warm side of wall
when installing shoe molding on a base board over hand wood floor , the shoe mold
should be ? -ANSnailed only to the base board
to facilitate handling + workability ... must speak jobsite addition of water to the concrete
mixture -ANSmaintain the slump, without exceeding the allow water - cement ratio .
Actual standard size of a concrete block ? -ANS7 5/8 x 7 5/8 x 15 5/8
Maximum threshold height of egress door , of group occupancy building ? -ANS1/2 inch
First leveling procedure after pouring concrete ? -ANSscreeding
timing for floating+ trouling is critical inproduce -ANSa smooth durable surface
when applying a run of wall cabinets , the cabinets should be? -ANSfitted with a hanger
rail