SAP S/4HANA Full List (TS410 Exam)
Study online at https://quizlet.com/_41jyzo
1. What are the scope of a planning run? -Regenerative Planning
-Net Change for Total Horizon
2. What is the purpose of Material Ledger? -the elimination of locking and increase
throughput for standard pricing for mate-
rial valuation
-improved and flexible valuation meth-
ods in multiple currencies and parallel ac-
counting
3. What is the output of an MRP run? -Planned Order
-Purchase Req for Dependent Require-
ments
-Reservation for Dependent Items
4. What is the master data need for Adv. Plan- - Location
ning? - Product
- Resource
5. List the Options for Running MRP? - Total Planning
- Single Item Planning Multilevel
- Single Item Planning Single Level
- Single Item Planning Interactive
6. What is the difference between the stock Stock Req - Real Time / Dynamic
requirements list and the MRP list? MRP List - Static / Frozen
7. What is the difference between MRP and MRP - planned on requirements (future,
Consumption Based Planning? current, forecast)
CBP - planning on historical data (histori-
cal)
8. What does a work center control?
, SAP S/4HANA Full List (TS410 Exam)
Study online at https://quizlet.com/_41jyzo
Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
Activity Types
9. What is the result of a completion confir- - Progress of the order / status update
mation? - GR partial or final
- Time Activity Update
- Scrap leftover material
10. What happens, on the Stock Requirements - planned order converts to production or-
List, when a planned order is converted to a der
production order for the finished product: - BOM + routing is copied from planned
order to production order
11. What happens, on the Stock Requirements - reservations for dependent components
List, when a planned order is converted to
a production order for the components:
12. What is a standard cost estimate used for? -Determine the sales price
- Update the standard price in material
master
- Calculate the planned cost in a production
order
13. What is a work center? - type of time (days, hours)
- where
- who
- identifies the resources
- formula calculations
, SAP S/4HANA Full List (TS410 Exam)
Study online at https://quizlet.com/_41jyzo
14. Describe each of the different types of - GR
goods movements. - GI
- Stock Transfer / Transfer Posting
15. What is a routing? Sequence of steps to complete the work
Quantity of time to complete the work
16. What transactions debit a production or- GI
der? Confirmation
External Processing
Overhead
Direct FI Postings
17. What transactions credit a production or- GR
der? Settlement
18. How is a Stock Transport Order used to GI for sending plant
complete a stock transfer? GR for receiving plant
19. What is the difference between a one step Authorizations needed to complete step
and a two-step stock transfer? Number of Documents
Level of Control
20. List the solutions of the SAP S4 HANA Suite Ariba
Concur
Successfactors
Fieldglass
Hybris
21. List the key innovations developed for SAP MRP
S4 HANA Inv Management
Material Valuation
Capacity Planning
Study online at https://quizlet.com/_41jyzo
1. What are the scope of a planning run? -Regenerative Planning
-Net Change for Total Horizon
2. What is the purpose of Material Ledger? -the elimination of locking and increase
throughput for standard pricing for mate-
rial valuation
-improved and flexible valuation meth-
ods in multiple currencies and parallel ac-
counting
3. What is the output of an MRP run? -Planned Order
-Purchase Req for Dependent Require-
ments
-Reservation for Dependent Items
4. What is the master data need for Adv. Plan- - Location
ning? - Product
- Resource
5. List the Options for Running MRP? - Total Planning
- Single Item Planning Multilevel
- Single Item Planning Single Level
- Single Item Planning Interactive
6. What is the difference between the stock Stock Req - Real Time / Dynamic
requirements list and the MRP list? MRP List - Static / Frozen
7. What is the difference between MRP and MRP - planned on requirements (future,
Consumption Based Planning? current, forecast)
CBP - planning on historical data (histori-
cal)
8. What does a work center control?
, SAP S/4HANA Full List (TS410 Exam)
Study online at https://quizlet.com/_41jyzo
Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
Activity Types
9. What is the result of a completion confir- - Progress of the order / status update
mation? - GR partial or final
- Time Activity Update
- Scrap leftover material
10. What happens, on the Stock Requirements - planned order converts to production or-
List, when a planned order is converted to a der
production order for the finished product: - BOM + routing is copied from planned
order to production order
11. What happens, on the Stock Requirements - reservations for dependent components
List, when a planned order is converted to
a production order for the components:
12. What is a standard cost estimate used for? -Determine the sales price
- Update the standard price in material
master
- Calculate the planned cost in a production
order
13. What is a work center? - type of time (days, hours)
- where
- who
- identifies the resources
- formula calculations
, SAP S/4HANA Full List (TS410 Exam)
Study online at https://quizlet.com/_41jyzo
14. Describe each of the different types of - GR
goods movements. - GI
- Stock Transfer / Transfer Posting
15. What is a routing? Sequence of steps to complete the work
Quantity of time to complete the work
16. What transactions debit a production or- GI
der? Confirmation
External Processing
Overhead
Direct FI Postings
17. What transactions credit a production or- GR
der? Settlement
18. How is a Stock Transport Order used to GI for sending plant
complete a stock transfer? GR for receiving plant
19. What is the difference between a one step Authorizations needed to complete step
and a two-step stock transfer? Number of Documents
Level of Control
20. List the solutions of the SAP S4 HANA Suite Ariba
Concur
Successfactors
Fieldglass
Hybris
21. List the key innovations developed for SAP MRP
S4 HANA Inv Management
Material Valuation
Capacity Planning