AIC 301 Level 1 Exam Practice Test Questions With Correct Answers /. What would be the most appropriate means for the contractor to communicate to the project owner an unforeseen condition not identified in the soils report? A. Document the issue in the job diary B. Issue a jobsite memorandum C. Draft a construction report D. Write a formal business letter - Answer-D. Write a formal business letter /.When is the best time to distribute the working agenda to the participants of a meeting? A. As a follow-up to the meeting B. At the beginning of the meeting C. About one day after the meeting D. About one day prior to the meeting - Answer-D. About one day prior to the meeting /.The contractor has tasked his project engineer with developing an agenda for a preconstruction meeting with the architect and owner. The project engineer has received numerous emails and RFIs from subcontractors and vendors requesting a wide range of information. Which document is most appropriate to distinguish between appropriate topics for the meeting and topics better addressed through other means? A. General conditions B. General requirements C. Technical specifications D. Supplementary conditions - Answer-B. General requirements /.What is the best time to distribute the meeting minutes to the participants? A. At the beginning of the meeting B. About one day after the meeting C. About one hour prior to the meeting D. About one day prior to the meeting - Answer-B. About one day after the meeting /.Which of the following statements is true about the use of texting as a means of communicating in the construction industry? A. A means of easily and effectively documenting communication B. Appropriate for clarifying but not for formal direction C. Should be completely avoided in construction D. Acceptable for communication if specifically allowed in the contract - Answer-B. Appropriate for clarifying but not for formal direction /.A subcontractor identifies a significant discrepancy between the architectural and structural drawings. The subcontractor immediately meets with the general contractor at their construction trailer to discuss the discrepancy. The general contractor agrees that this could be a significant change depending on which of the drawings describes the designer's intent. Which of the following actions is the most appropriate in this situation? A. Draft a change order proposal and arrange a meeting with the design team and owner to resolve the conflict. B. Draft an RFI that describes the discrepancy in detail and submit it to the architect immediately. C. Send a short text alerting the design team of the issue and discuss the discrepancy in detail at the next meeting. D. Email the engineer of record to collect relevant background information and follow up with a formal RFI to the architect - Answer-B. Draft an RFI that describes the discrepancy in detail and submit it to the architect immediately. /.What are the leadership skills needed to conduct a productive meeting? A. Planning, probing questions, responding critically, and decision making B. Planning, timing, coordinating, probing, responding critically, and following up C. Listening attentively, responding constructively, soliciting all ideas, and matching decision making to the situation D. Coordinating, listening selectively, responding critically, soliciting supportive ideas, and adjusting decision making to the situation - Answer-C. Listening attentively, responding constructively, soliciting all ideas, and matching decision making to the situation /.Which of the following statements made by the indicated parties below would least likely be made at an owner/architect/contractor progress meeting? A. Contractor: "There are 14 unanswered RFIs on the log." B. Superintendent: "A third party inspector will assist the supervision of the roofing installation." C. Owner: "It is very likely, that change order proposal #23 will be accepted." D. Project manager: "The bond rate for ABC subcontractor is 1.45%" - Answer-D. Project manager: "The bond rate for ABC subcontractor is 1.45%" /.What is a listener's retention percentage of an oral conversation? A. 10% B. 50% C. 60% D. 90% - Answer-A. 10%

Show more Read less
Institution
AIC Level 1
Course
AIC Level 1

Content preview

AIC 301 Level 1 Exam Practice Test
Questions With Correct Answers

/. What would be the most appropriate means for the contractor to communicate to the
project owner an unforeseen condition not identified in the soils report?

A. Document the issue in the job diary
B. Issue a jobsite memorandum
C. Draft a construction report
D. Write a formal business letter - Answer-✅D. Write a formal business letter

/.When is the best time to distribute the working agenda to the participants of a
meeting?

A. As a follow-up to the meeting
B. At the beginning of the meeting C. About one day after the meeting
D. About one day prior to the meeting - Answer-✅D. About one day prior to the meeting

/.The contractor has tasked his project engineer with developing an agenda for a
preconstruction meeting with the architect and owner. The project engineer has
received numerous emails and RFIs from subcontractors and vendors requesting a
wide range of information. Which document is most appropriate to distinguish between
appropriate topics for the meeting and topics better addressed through other means?

A. General conditions
B. General requirements
C. Technical specifications
D. Supplementary conditions - Answer-✅B. General requirements

/.What is the best time to distribute the meeting minutes to the participants?

A. At the beginning of the meeting B. About one day after the meeting C. About one
hour prior to the meeting
D. About one day prior to the meeting - Answer-✅B. About one day after the meeting

/.Which of the following statements is true about the use of texting as a means of
communicating in the construction industry?

A. A means of easily and effectively documenting communication
B. Appropriate for clarifying but not for formal direction
C. Should be completely avoided in construction

, D. Acceptable for communication if specifically allowed in the contract - Answer-✅B.
Appropriate for clarifying but not for formal direction

/.A subcontractor identifies a significant discrepancy between the architectural and
structural drawings. The subcontractor immediately meets with the general contractor at
their construction trailer to discuss the discrepancy. The general contractor agrees that
this could be a significant change depending on which of the drawings describes the
designer's intent. Which of the following actions is the most appropriate in this situation?

A. Draft a change order proposal and arrange a meeting with the design team and
owner to resolve the conflict.
B. Draft an RFI that describes the discrepancy in detail and submit it to the architect
immediately.
C. Send a short text alerting the design team of the issue and discuss the discrepancy
in detail at the next meeting.
D. Email the engineer of record to collect relevant background information and follow up
with a formal RFI to the architect - Answer-✅B. Draft an RFI that describes the
discrepancy in detail and submit it to the architect immediately.

/.What are the leadership skills needed to conduct a productive meeting?

A. Planning, probing questions, responding critically, and decision making
B. Planning, timing, coordinating, probing, responding critically, and following up
C. Listening attentively, responding constructively, soliciting all ideas, and matching
decision making to the situation
D. Coordinating, listening selectively, responding critically, soliciting supportive ideas,
and adjusting decision making to the situation - Answer-✅C. Listening attentively,
responding constructively, soliciting all ideas, and matching decision making to the
situation

/.Which of the following statements made by the indicated parties below would least
likely be made at an owner/architect/contractor progress meeting?

A. Contractor: "There are 14 unanswered RFIs on the log."
B. Superintendent: "A third party inspector will assist the supervision of the roofing
installation."
C. Owner: "It is very likely, that change order proposal #23 will be accepted."
D. Project manager: "The bond rate for ABC subcontractor is 1.45%" - Answer-✅D.
Project manager: "The bond rate for ABC subcontractor is 1.45%"

/.What is a listener's retention percentage of an oral conversation?

A. 10%
B. 50%
C. 60%
D. 90% - Answer-✅A. 10%

Written for

Institution
AIC Level 1
Course
AIC Level 1

Document information

Uploaded on
October 6, 2025
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainariam Harvard University
Follow You need to be logged in order to follow users or courses
Sold
148
Member since
1 year
Number of followers
7
Documents
8376
Last sold
20 hours ago

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don't find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. I WISH YOU SUCCESS IN YOUR EDUCATION JOURNEY

Read more Read less
3.3

26 reviews

5
8
4
2
3
9
2
3
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions