Actual Complete Real Exam Questions with 100% Correct
Answers | Verified Answers | Already Graded A+ | Newest
Version | Just Released!!
How is the start of IEM indicated on the Quarterly Board? -
ANSWER-A vertical
red with status on the left side of
the line
When equipment is removed from lay up, what is still
required? - ANSWER-
Regularly scheduled maintenance if it is
within periodicity
How often should the Work Center Supervisor create an
external backup of
their workcenter in SKED? - ANSWER-
Weekly Basis
An LGL will have a line item in SKED for what? - ANSWER-
Each piece of
equipment to be
maintained
, What is 18M-3(S-6R) an example of? - ANSWER-
Convenience Related
Maintenance
What is Q-1(#S-1R) an example of? - ANSWER-
Mandatory Related
Maintenance
What does HMUG stand for? - ANSWER-Hazardous Material
Users Guide
What is the purpose of the HMUG? - ANSWER-To supplement
the Material
Safety Data Sheets (MSDS) to provide Navy personnel with
safety data for
Hazardous Materials
What is the purpose of the MSDS? - ANSWER-To be on
hand anytime a
maintenance person is handling
HAZMAT
When performing a spotcheck on maintenance that required a
Tagout, where does the tagout number go? - ANSWER-Needs
to be written on the spotcheck form, with a copy of the TORS is
attached
If a piece of equipment identified for validation is no longer on
board, what must the Work Center Supervisor do? - ANSWER-