answers
Personnel Qualification Standards sets a minimum level of knowledge and skill that
must be attained to qualify for a watchstation - CORRECT ANSWER-True
Who updates and maintains the PQS progress chart? - CORRECT ANSWER-
workcenter supervisor
The PQS progress chart is reviewed by... on a ... basis - CORRECT ANSWER-Division
Officer; Weekly
Which Section in the PQS book breaks down the subject equipment into smaller and
more easily understood components and component parts? - CORRECT ANSWER-
Systems
Which of the following sections of the PQS book contains the basic knowledge needed
to understand duties to be performed? - CORRECT ANSWER-Fundamentals
Who is authorized to sign off individual line items in a PQS book? - CORRECT
ANSWER-Qualifiers
To get a PQS line item signed off, the trainee must be able to answer or perform task
for that particular item. - CORRECT ANSWER-True
Which of the following tools are used to retrieve small items that fall into places
unreachable by hand? - CORRECT ANSWER-Flexible retrieving tools
The type of wrench that requires calibration for accuracy is the ... wrench - CORRECT
ANSWER-torque
it is NOT safe to operate electrical power tools in areas where ... are present. -
CORRECT ANSWER-Flammable Gases
Electrical power tools must be inspected prior to issue by a qualified ... - CORRECT
ANSWER-Electrician
Torque wrenches are used to measure.... - CORRECT ANSWER-foot or inch/pounds
a torque wrench has to be tested and calibrated for accuracy - CORRECT ANSWER-
True
, When using a torque wrench with an extension the torque applied to the fastener will....
- CORRECT ANSWER-be different than the torque indicated on wrench dial
The time required to complete all maintenance listed on the EGL should not exceed ....
hours - CORRECT ANSWER-8
The PMS master file contains maintenance requirement information that pertains to all
equipment of a command - CORRECT ANSWER-True
The effective use of available manpower and material resources is the objective of
the.... - CORRECT ANSWER-3m System
What provides a listing of all maintenance index pages (MIPs) applicable to a particular
work center? - CORRECT ANSWER-List of effective pages(LOEP)
The list of all maintenance actions for a specific or similar equipment/systems is called a
... - CORRECT ANSWER-Maintenance index page(MIP)
Which of the following provides a detailed procedure for performing preventive
maintenance? - CORRECT ANSWER-MRC
The MRC is current if its SYSCOM control number matches with the number on the
EGL (equipment guide list) - CORRECT ANSWER-False
The SYSCOM MRC control number on the MRC must match the number on the.... -
CORRECT ANSWER-MIP
The person responsible for managing the 3-m system is the ..... - CORRECT ANSWER-
Executive officer
The person responsible to the XO for all administrative facets of the 3-m system is the
..... - CORRECT ANSWER-3-m coordinator
The periodicity code 2D on the MRC means that the particular maintenance
requirement must be accomplished..... - CORRECT ANSWER-every 2 days
Which of the following list, contain the components required to be "tagged out" for a
specific PMS check? - CORRECT ANSWER-TGL
The weekly schedule is updated by the...... - CORRECT ANSWER-Work center
supervisor
on a quarterly schedule, completed maintenance items are identified by ..... -
CORRECT ANSWER-X ing it