material or equipment supplier - ANSWER-shop drawings
that clarify the architect's drawings and specifications are
often provided by
job cost system - ANSWER-costs are accumulated by
individual jobs when material is issued and labor costs
incurred (estimated vs actual cost).
Builder Risk Insurance - ANSWER-protect the contractor
against any loss or damage to the project structure and
,materials or equipment purchased for the project while it is
under construction.
payment and performance bond (Miller Act) - ANSWER-
two types of bond are required on all federal project
Performance Bond - ANSWER-A contract bond
guaranteeing that a contractor's work will be completed
according to plans and specifications.
Bid bonds/surety bonds - ANSWER-to ensure that the
successful bidder will accept the contract once awarded
,property (NOT owner, prime contractor or subcontractor) -
ANSWER-A subcontractor has refused to pay employees
for their work on a project. The employee's lien for unpaid
wages may be filed against the
The ADA applies to all employers/businesses with 15 or
more employees - ANSWER-The rules and regulations of
the ADA apply to all employers with a minimum of how
many employees?
18 (depart of labor prohibit all hazardous work for minors)
- ANSWER-A roofing contractor wants to hire some
summer help. Summer help should be at least
, 3 years - ANSWER-lead pre-notification pamphlet
confirmation of the receipt of delivery must be kept
OSHA Form 301 (Injury and Illness Incident Report) 6 or 7
working days - ANSWER-Form that requires much more
detail about each injury or illness. Form 301 must be
completed within _____ working days from the time the
employer learns of an occupational injury or illness.
profit - ANSWER-total revenue minus total cost
Invitation to Bid - ANSWER-A documents described the
proposed project.