PJM Generation Operation Exam |
Actual Key Questions With Answers
What time period is the Market Participant Bid/Offer Period?-correct-answer-
0800-1100
What time are DA Market results posted?-correct-answer-1330
What time period is the re-bid period?-correct-answer-1330-1415
What is the maximum for a generation capacity resource offer?-correct-answer-
$2000/MWh
What is the cap for price-based offers?-correct-answer-Price-based offers will be
capped at the lower of $2000/MWh or the corresponding cost-based offer when
costs are above $1000/MWh
Example:
If a unit's cost is $1500, the price offer can be no higher than $1500
, 2|Page
If $800, price offer can be no higher than $1000
If $2200, price offer can be no higher than $2000
Real time real and reactive power telemetry: Generators participating in the PJM
market as...-correct-answer-capacity resources
Real time real and reactive power telemetry: Generators __ MW (Maximum
facility output) or larger-correct-answer-10MW
Real time real and reactive power telemetry: Generators greater than __ MW
(Maximum facility output) and connected at a bus operating at __ kV or greater-
correct-answer-1MW; 50 kV
Real time real and reactive power telemetry: Solar parks __MW (Maximum Facility
Output) or greater-correct-answer-3 MW
Real time real and reactive power telemetry: Distributed generators modeled less
than __ MW (Maximum Facility Output)-correct-answer-10 MW