PMT 4800 Practice Test 1, DAWIA PM Practitioner Exam -
CONSOLIDATED
The program office for a Changes to maintenance and supply planning based on the new
Navy shipboard component
communications system
early in the TMRR phase
just conducted an
affordability analysis of
their key performance
parameters. The program
can save 10% on overall life
cycle cost by trading 5% of
point to point surface
communications range KPP
for greater component
reliability. The Navy CDD
sponsor agreed to include
the requirements change as
part of staffing for the CDD-
V. Choose the greatest
potential impact of the
changed requirements on the
Logistics Functional area.
Changes to manufacturing
methods Modification of
the contract Changes to
maintenance and supply
planning based on the new
component Additional
testing to verify that new
requirements are met without
impacting other
requirements
,Effective________is multi- Configuration Management
faceted
and includes managing the
impact of changes on
system operation,
interoperability, long-term
maintenance, and the
technical data package
(TDP).
Configuration
Management Earned
Value Management
(EVM)
Enterprise Resource Planning
(ERP) Integrated Product
and Process Development
(IPPD)
A government employee Unauthorized Commitment
touring a contractor facility
stops to speak with a worker
on the manufacturing floor.
“Any chance you could
make that widget a little
bigger?” She asks the worker.
“Sure, no problem,” says
the worker and he makes
the widget bigger. The
contracting officer receives
an invoice for the widget a
few weeks later that is
significantly higher than she
expected. This is an
example of a/an_______.
Supplemental
Agreement
Unauthorized
Commitment
Change Order
Reprogramming
Action
A program office can save 10% Changes to the system performance specifications
,on overall life cycle cost by
reducing the communication
range KPP by 5%. Choose the
greatest potential impact
of the changed
requirements on the
Systems Engineering
Functional area.
Shortage of procurement
funds to cover
communications testing
Changes to repair
procedures Changes to
the system performance
specifications
Changes to the contract
incentives for EMD
, Recently, the Air Force MDD - Materiel Solution Analysis
identified a capability need
for automated contingency
airfield surveillance and
several technologies with the
potential to meet the need.
Subsequently, the Air Force
Requirements Oversight
Counsel approved the Initial
Capability Document and
Cost Assessment and
Program Evaluation (Office
of the Secretary of
Defense–Director, CAPE)
provided study guidance for
the Analysis of Alternatives
(AoA). Following this, the
Air Force selected an AoA
study team lead and the
study team developed an
AOA study plan. Based on
this scenario, what would
you recommend as the best
entry point for this
program?
MS A – Technology
Maturation & Risk
Reduction
MDD – Materiel Solution
Analysis DRFPRD/MS B
– Engineering and
Manufacturing
Development
MS C – Production and
Deployment
Which of the following is a Statement of Work (SOW)
way the government
communicates requirements
to a vendor during a
source selection?
Request for Information
CONSOLIDATED
The program office for a Changes to maintenance and supply planning based on the new
Navy shipboard component
communications system
early in the TMRR phase
just conducted an
affordability analysis of
their key performance
parameters. The program
can save 10% on overall life
cycle cost by trading 5% of
point to point surface
communications range KPP
for greater component
reliability. The Navy CDD
sponsor agreed to include
the requirements change as
part of staffing for the CDD-
V. Choose the greatest
potential impact of the
changed requirements on the
Logistics Functional area.
Changes to manufacturing
methods Modification of
the contract Changes to
maintenance and supply
planning based on the new
component Additional
testing to verify that new
requirements are met without
impacting other
requirements
,Effective________is multi- Configuration Management
faceted
and includes managing the
impact of changes on
system operation,
interoperability, long-term
maintenance, and the
technical data package
(TDP).
Configuration
Management Earned
Value Management
(EVM)
Enterprise Resource Planning
(ERP) Integrated Product
and Process Development
(IPPD)
A government employee Unauthorized Commitment
touring a contractor facility
stops to speak with a worker
on the manufacturing floor.
“Any chance you could
make that widget a little
bigger?” She asks the worker.
“Sure, no problem,” says
the worker and he makes
the widget bigger. The
contracting officer receives
an invoice for the widget a
few weeks later that is
significantly higher than she
expected. This is an
example of a/an_______.
Supplemental
Agreement
Unauthorized
Commitment
Change Order
Reprogramming
Action
A program office can save 10% Changes to the system performance specifications
,on overall life cycle cost by
reducing the communication
range KPP by 5%. Choose the
greatest potential impact
of the changed
requirements on the
Systems Engineering
Functional area.
Shortage of procurement
funds to cover
communications testing
Changes to repair
procedures Changes to
the system performance
specifications
Changes to the contract
incentives for EMD
, Recently, the Air Force MDD - Materiel Solution Analysis
identified a capability need
for automated contingency
airfield surveillance and
several technologies with the
potential to meet the need.
Subsequently, the Air Force
Requirements Oversight
Counsel approved the Initial
Capability Document and
Cost Assessment and
Program Evaluation (Office
of the Secretary of
Defense–Director, CAPE)
provided study guidance for
the Analysis of Alternatives
(AoA). Following this, the
Air Force selected an AoA
study team lead and the
study team developed an
AOA study plan. Based on
this scenario, what would
you recommend as the best
entry point for this
program?
MS A – Technology
Maturation & Risk
Reduction
MDD – Materiel Solution
Analysis DRFPRD/MS B
– Engineering and
Manufacturing
Development
MS C – Production and
Deployment
Which of the following is a Statement of Work (SOW)
way the government
communicates requirements
to a vendor during a
source selection?
Request for Information