Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

VA DEQ ESC INSPECTOR EXAM NEWEST EXAM / VA DEQ ESC INSPECTOR EXAM PREPARATION/VA DEQ ESC INSPECTOR PRACTICE EXAM WITH COMPLETE QUESTIONS AND CORRECT ANSWERS| BRAND NEW VERSION!

Beoordeling
-
Verkocht
-
Pagina's
39
Cijfer
A+
Geüpload op
15-10-2025
Geschreven in
2025/2026

VA DEQ ESC INSPECTOR EXAM NEWEST EXAM / VA DEQ ESC INSPECTOR EXAM PREPARATION/VA DEQ ESC INSPECTOR PRACTICE EXAM WITH COMPLETE QUESTIONS AND CORRECT ANSWERS| BRAND NEW VERSION! Minimum Standard 1 - Correct Answer-Stabilization permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to be left dormant for more than one year Site NOT at Final Grade - Correct Answer-- stabilize in 14 days - temporarily seed - mulch - permanently stabilize if dormant 1 year Site at Final Grade - Correct Answer-- stabilize in 7 days (recommended immediately) - permanently or temporarily seed and mulch - mulch/matting/straw Minimum Standard 2 - Correct Answer-Stock Piles, Waste and Borrow Areas 2 | Page VA DEQ ESC Inspector Exam Newest Exam during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts and detains from disturbed areas Minimum Standard 3 - Correct Answer-Permanent Vegetation permanent vegetation cover shall be established on denuded areas not otherwise permanently stabilized (permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no % associated with this*) reduce erosion and decrease sediment yield from disturbed area this is the standard used to verify that a site is ready for release of bonds or surety Minimum Standard 4 - Correct Answer-First-Step Measures Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place 3 | Page VA DEQ ESC Inspector Exam Newest Exam a certain amount of initial land disturbance may be required to provide access for equipment to install the perimeter controls, but site clearing and grading should be kept to a minimum until the perimeter controls are in place intercepts and detains small amounts of sediment from disturbed areas during construction operation to prevent sediment from leaving the site and decrease velocity of sheet flows and low-to-moderate level channel flow Perimeter Controls - Correct Answer-assures that sediment does not leave the perimeter of the land-disturbing area once site clearing, grading, and construction commences

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

VA DEQ ESC Inspector Exam Newest Exam


VA DEQ ESC INSPECTOR EXAM NEWEST EXAM / VA DEQ ESC
INSPECTOR EXAM PREPARATION/VA DEQ ESC INSPECTOR
PRACTICE EXAM WITH COMPLETE QUESTIONS AND CORRECT
ANSWERS| BRAND NEW VERSION!
Minimum Standard 1 - Correct Answer-Stabilization


permanent or temporary soil stabilization shall be applied to denuded areas
within seven days after final grade is reached on any portion of the site;
temporary soil stabilization shall be applied within seven days to denuded areas
that may not be at final grade but will remain dormant for longer than 14 days;
permanent stabilization shall be applied to areas that are to be left dormant for
more than one year


Site NOT at Final Grade - Correct Answer-- stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


Site at Final Grade - Correct Answer-- stabilize in 7 days (recommended
immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw


Minimum Standard 2 - Correct Answer-Stock Piles, Waste and Borrow Areas

1|Page

, VA DEQ ESC Inspector Exam Newest Exam



during construction, soil stock piles and borrow areas shall be stabilized or
protected with sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact and silt
fence intercepts and detains from disturbed areas


Minimum Standard 3 - Correct Answer-Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not otherwise
permanently stabilized (permanent vegetation shall not be considered established
until a ground cover is achieved that is uniform, mature enough to survive, and
will inhibit erosion *there is no % associated with this*)


reduce erosion and decrease sediment yield from disturbed area


this is the standard used to verify that a site is ready for release of bonds or surety


Minimum Standard 4 - Correct Answer-First-Step Measures


Sediment basins and traps, perimeter dikes, sediment barriers and other
measures intended to trap sediment shall be constructed as a first step in any
land-disturbing activity and shall be made functional before upslope land
disturbance takes place




2|Page

, VA DEQ ESC Inspector Exam Newest Exam

a certain amount of initial land disturbance may be required to provide access for
equipment to install the perimeter controls, but site clearing and grading should
be kept to a minimum until the perimeter controls are in place


intercepts and detains small amounts of sediment from disturbed areas during
construction operation to prevent sediment from leaving the site and decrease
velocity of sheet flows and low-to-moderate level channel flow


Perimeter Controls - Correct Answer-assures that sediment does not leave the
perimeter of the land-disturbing area once site clearing, grading, and construction
commences


Examples: silt fences, sediment traps, sediment basins, construction entrance,
temporary diversions, diversions


Minimum Standard 5 - Correct Answer-Earthen Structure Stabilization


stabilization measures shall be applied to earthen structures such as dams, dikes,
and diversions immediately after installation


reduce erosion and sedimentation and reduce damage from sediment and runoff
to downstream or off-site areas


Minimum Standard 6 - Correct Answer-Traps and Basins




3|Page

, VA DEQ ESC Inspector Exam Newest Exam

sediment traps and basins shall be designed and constructed based upon the total
drainage area (not just disturbed area) to be served by the trap or basin


Sediment Traps - Correct Answer-minimum storage capacity shall be 134 cubic
yards per acre of drainage area and shall only control drainage areas less than 3
acres


*stone outlet = trap*


Sediment Basins - Correct Answer-surface runoff from disturbed areas that is
comprised of flow from drainage areas greater than or equal to 3 acres shall be
controlled by a basin; minimum storage capacity of a sediment basin shall be 134
cubic yards per acre of drainage area; the outfall system shall, at a minimum,
maintain the structural integrity of the basin during a 25-year storm of 24-hour
duration; runoff coefficients used in runoff calculations shall correspond to a bare
earth condition or those conditions expected to exist while the sediment basin is
utilized.


Sediment Trapping Devises - Correct Answer-1. place near the lowest drainage
points of a project


2. install as a first-step measure [MS-4]


3. stabilize immediately [MS-5]


4. must include outlet protection for basins [MS-11]

4|Page

Geschreven voor

Vak

Documentinformatie

Geüpload op
15 oktober 2025
Aantal pagina's
39
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
SophiaBennettRN Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
24
Lid sinds
1 jaar
Aantal volgers
1
Documenten
2262
Laatst verkocht
1 week geleden
TopGrade Tutor: Expert Psychology, Nursing, Pharmacology & Computer and Math Resources

Welcome to my academic support store, your trusted destination for top-tier homework help and tutoring services! Specializing in key subjects like Psychology, Nursing, Human Resource Management, and Mathematics, I’m dedicated to helping students excel with high-quality, meticulously crafted resources. My mission is to deliver scholarly, reliable content that guarantees excellent grades, earning me a reputation as one of Stuvia’s BEST GOLD RATED TUTORS. Whether you need assistance with quizzes, exams, or detailed study materials, I prioritize your success with a commitment to academic excellence and results you can count on

Lees meer Lees minder
3.9

7 beoordelingen

5
4
4
1
3
0
2
1
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen