Terms in this set (110)
Which of the following D. A contractor with whom the project owner has
would be considered a established a contract.
primecontractor?
Which of the following D. Hourly wages, fridge benefit packages, payroll
correctly identifies what is taxes insurance and safety costs, and small tools and
included in legitimate consumables
labor costs?
Which in the following B. To Effectively manage and lead the crew
best illustrates the
PRIMARY role of a
foreman?
As a foreman what should D. Keeping the crew actively engaged in completing
ALWAYS be your FIRST their work
priority when planning a
job?
As a foreman what should B. Developing a job strategy before the job begins
ALWAYS be your FIRST
priority when planning of
a project?
,Which of the following A. Breaking the job into small manageable pieces
describe the purpose of
Short Interval Planning or
Look ahead planning?
Which of the following is A. Read all the project-related documents
the FIRST thing a foreman
must do before beginning
to plan a job?
Which of the following A. To Create a product in the shop and install it in the
provides the BEST field
example of
prefabrication?
Which of the following is C. The work completed by the individual crew
NOT required on a daily members
log?
Which of the following is D. Have all the materials and equipment delivered at
NOT likely to lead to the beginning of the job
improved material
handling?
Which of the following A. Bag and Tag all materials as appropriate
purchasing procedures is
MOST likely to reduce
material handling time?
What should a foreman do C. Notify the Project manager and note the damage
if damage to he/she is on the daily log.
discovered AFTER the
delivery driver has left the
job site?
Which of the following D. As close to the point of installation as possible
location represents the
BEST place to store job
site materials in a manner
that enhance says
productivity?
, With which of the A. Labor
following costs should a
foreman be MOST
concerned?
Which of the following is D. Home office overhead
NOT considered a DIRECT
job cost?
An ______ occurs when any B. Addendum
condition or document
modifies the work as
defined in the contract
during the BIDDING
process
Where can the B. Within the contract documents.
requirements for "Job
Close Out" be found?
During the course of a C. Maintain an accurate job log in case specific
project you have noticed questions are asked about why the project was
that there is a greater than completed in ways it was.
normal number of Change
orders being submitted.
Which of the following is
the MOST important step
that you need to take?
A "Log Book" is the most A. The events that occurred on the job site each day.
appropriate place to
document which of the
following?