Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CMGT 3500 Final Study Guide Questions And Answers Rated 100%!!!

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
16-10-2025
Geschreven in
2025/2026

Spearin Doctrine - ANS Is a warranty supplied by the owner to the contractor that if the contractor builds according to the plans and specs, a satisfactory product will result. Promissory Estoppel - ANS An agreement or contract exists, based largely on the behavior or actions of the parties involved (implied agreement). Contract Law and Tort Law Difference - ANS Contract Law supports and upholds voluntary duties between parties, agreed to in a contract. Tort Law supports and upholds duties imposed by law between parties and is not dependent on any contract between them. Elements of a Contract - ANS Offer & Acceptance, Meetings of the Minds, Consideration, Lawful Subject Matter, and Competent Parties. Contract Delivery Methods - ANS Traditional Design-Bid-Build (DBB), Traditional DBB with early procurement, Traditional DBB with Construction Manager, Traditional DBB with early procurement and CM, DBB + CM @ Risk, Design-Build or EPC, Turnkey, and Fast Track What is a Contract/Lowest Responsive Responsible Bidder meaning - ANS The Bidder who fully complied with all of the bid requirements and whose past performance, reputation, and financial capability is deemed acceptable, and who has offered the most advantageous pricing or cost-benefit, based on the criteria stipulated in the bid documents. Basic premise of Contract Law - ANS Party must honor contract or respond in damages, parties presumed to know content of contracts, contracts upheld as written. AIA - ANS American Institute of Architects AGC - ANS Associated General Contractors of America IFB - ANS Invitation For Bidder Three Project Award Methods - ANS Competitive bidding, Negotiation, and Direct Assignment Elements of the Bid - ANS Advertisement, Invitation to Bid, and Instructions to Bidders Three reasons for owner to issue addenda to bid documents - ANS Correction of errors or discrepancies in specs. Errors in drawings are corrected through an updated revision of the drawings. All revisions should be conveyed to all bidders uniformly. Making owner-initiated changes. Furnishing clarifications in response to questions raised by bidders. Same answers should be given to all bidders. Additions, deletions, or modification of products to include "or equal." Changing previously stated requirements including due date, period of validity of bids, or other important conditions. Three advantages to Competitive Bidding - ANS Provides clear idea of total construction cost. Fair to all contractors. Allows for competition and innovation to reduce price. Gives chance for new contractors with limited past experience. Shifts risk from owner to contractor. General Conditions/ General Requirement typical project cost (Direct/Indirect) - ANS General Conditions typically refer to indirect / overhead expenses associated with the project. Play a critical role in cost estimation. General Requirements is crucial for cost estimation. Provides information needed to determine pricing (labor, equipment,other) Direct cost Following honest errors, list three conditions that must be met for bid withdrawal - ANS Following "Honest errors" by the bidder, he can withdraw his bid upon owner's approval. For this condition to apply, 3 conditions have to be fulfilled: Mistake is considerable and of sufficient magnitude. Mistake is not result of negligence or inexperience. Owner does not suffer from withdrawal. List/ Explain the typical 4 types of Specifications - ANS Method System: Descriptive or Design Specifications Results System: Performance or Output Specifications Reference Specs: Refer to Established Standards Proprietary Specs: Closed Specs, Specifying Exact Type and Model Prescriptive Specifications include method/ design and performance specs, explain/ describe both method and performance specs - ANS Performance Specification: The result or performance of the finished product (rather than specific methods and materials used to construct) are specified. DESIGN: Specifier describes in detail the method, material, dimensions, workmanship, and erection or installation procedures. Describe Reference Specifications - ANS Refers to a standard established for material, test method, workmanship, or installation procedure. Standards can follow either design or performance specs. Contractor is responsible for acquiring a copy of the referenced standard specs, and following its instructions. CSI - ANS Construction Specifications Institute ASTM - ANS American Society for Testing and Materials AASHTO - ANS American Association of State Highway and Transformation Officials 3 parties to a Surety Agreement - ANS Owner is the obligee. Contractor is the principal. Surety is the guarantor. 3 C's of a surety Investigation - ANS Character Capacity Capital Construction Bond Types - ANS Bid Bond Performance Bond Payment Bond Warranty Bond Three types of Alternative Dispute Resolution - ANS Arbitration Mediation Early Neutral Evaluation (ENE) Dispute Review Boards (DRB) Defenses against Liquidated Damages - ANS Proving the Project is Substantially Complete Excusable or Compensable Delays Concurrent Delays List the 4 types of delays associated with liquidated damages - ANS Excusable Delays Compensable Delays Non-Excusable/ Non-Compensable Delays Concurrent Delays

Meer zien Lees minder
Instelling
CMGT
Vak
CMGT

Voorbeeld van de inhoud

CMGT 3500 Final Study Guide
Questions And Answers Rated 100%!!!




A
R
U
LA
C
O
D

, Spearin Doctrine - ANS Is a warranty supplied by the owner to the contractor that if the
contractor builds according to the plans and specs, a satisfactory product will result.

Promissory Estoppel - ANS An agreement or contract exists, based largely on the behavior
or actions of the parties involved (implied agreement).




A
Contract Law and Tort Law Difference - ANS Contract Law supports and upholds voluntary
duties between parties, agreed to in a contract.




R
Tort Law supports and upholds duties imposed by law between parties and is not dependent on
any contract between them.

Elements of a Contract - ANS Offer & Acceptance, Meetings of the Minds, Consideration,



U
Lawful Subject Matter, and Competent Parties.

Contract Delivery Methods - ANS Traditional Design-Bid-Build (DBB), Traditional DBB with
LA
early procurement, Traditional DBB with Construction Manager, Traditional DBB with early
procurement and CM, DBB + CM @ Risk, Design-Build or EPC, Turnkey, and Fast Track

What is a Contract/Lowest Responsive Responsible Bidder meaning - ANS The Bidder
who fully complied with all of the bid requirements and whose past performance, reputation, and
financial capability is deemed acceptable, and who has offered the most advantageous pricing
C

or cost-benefit, based on the criteria stipulated in the bid documents.

Basic premise of Contract Law - ANS Party must honor contract or respond in damages,
parties presumed to know content of contracts, contracts upheld as written.
O


AIA - ANS American Institute of Architects
D



AGC - ANS Associated General Contractors of America

IFB - ANS Invitation For Bidder

Three Project Award Methods - ANS Competitive bidding, Negotiation, and Direct
Assignment

Elements of the Bid - ANS Advertisement, Invitation to Bid, and Instructions to Bidders

Geschreven voor

Instelling
CMGT
Vak
CMGT

Documentinformatie

Geüpload op
16 oktober 2025
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.39
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
DocLaura Galen College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
159
Lid sinds
2 jaar
Aantal volgers
38
Documenten
6400
Laatst verkocht
1 week geleden

4.2

44 beoordelingen

5
27
4
4
3
10
2
2
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen