Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CMGT 3500 FINAL STUDY GUIDE QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
17-10-2025
Written in
2025/2026

CMGT 3500 FINAL STUDY GUIDE QUESTIONS AND ANSWERS Spearin Doctrine - ANSWER-Is a warranty supplied by the owner to the contractor that if the contractor builds according to the plans and specs, a satisfactory product will result. Promissory Estoppel - ANSWER-An agreement or contract exists, based largely on the behavior or actions of the parties involved (implied agreement). Contract Law and Tort Law Difference - ANSWER-Contract Law supports and upholds voluntary duties between parties, agreed to in a contract. Tort Law supports and upholds duties imposed by law between parties and is not dependent on any contract between them. Elements of a Contract - ANSWER-Offer & Acceptance, Meetings of the Minds, Consideration, Lawful Subject Matter, and Competent Parties. Contract Delivery Methods - ANSWER-Traditional Design-Bid-Build (DBB), Traditional DBB with early procurement, Traditional DBB with Construction Manager, Traditional DBB with early procurement and CM, DBB + CM @ Risk, Design-Build or EPC, Turnkey, and Fast Track What is a Contract/Lowest Responsive Responsible Bidder meaning - ANSWER-The Bidder who fully complied with all of the bid requirements and whose past performance, reputation, and financial capability is deemed acceptable, and who has offered the most advantageous pricing or cost-benefit, based on the criteria stipulated in the bid documents. Basic premise of Contract Law - ANSWER-Party must honor contract or respond in damages, parties presumed to know content of contracts, contracts upheld as written. AIA - ANSWER-American Institute of Architects AGC - ANSWER-Associated General Contractors of America IFB - ANSWER-Invitation For Bidder Three Project Award Methods - ANSWER-Competitive bidding, Negotiation, and Direct Assignment Elements of the Bid - ANSWER-Advertisement, Invitation to Bid, and Instructions to Bidders Three reasons for owner to issue addenda to bid documents - AN

Show more Read less
Institution
CMGT 3500
Course
CMGT 3500

Content preview

CMGT 3500 FINAL STUDY GUIDE
QUESTIONS AND ANSWERS
Spearin Doctrine - ANSWER-Is a warranty supplied by the owner to the contractor
that if the contractor builds according to the plans and specs, a satisfactory product
will result.

Promissory Estoppel - ANSWER-An agreement or contract exists, based largely on
the behavior or actions of the parties involved (implied agreement).

Contract Law and Tort Law Difference - ANSWER-Contract Law supports and
upholds voluntary duties between parties, agreed to in a contract.
Tort Law supports and upholds duties imposed by law between parties and is not
dependent on any contract between them.

Elements of a Contract - ANSWER-Offer & Acceptance, Meetings of the Minds,
Consideration, Lawful Subject Matter, and Competent Parties.

Contract Delivery Methods - ANSWER-Traditional Design-Bid-Build (DBB),
Traditional DBB with early procurement, Traditional DBB with Construction Manager,
Traditional DBB with early procurement and CM, DBB + CM @ Risk, Design-Build or
EPC, Turnkey, and Fast Track

What is a Contract/Lowest Responsive Responsible Bidder meaning - ANSWER-The
Bidder who fully complied with all of the bid requirements and whose past
performance, reputation, and financial capability is deemed acceptable, and who has
offered the most advantageous pricing or cost-benefit, based on the criteria
stipulated in the bid documents.

Basic premise of Contract Law - ANSWER-Party must honor contract or respond in
damages, parties presumed to know content of contracts, contracts upheld as
written.

AIA - ANSWER-American Institute of Architects

AGC - ANSWER-Associated General Contractors of America

IFB - ANSWER-Invitation For Bidder

Three Project Award Methods - ANSWER-Competitive bidding, Negotiation, and
Direct Assignment

Elements of the Bid - ANSWER-Advertisement, Invitation to Bid, and Instructions to
Bidders

Written for

Institution
CMGT 3500
Course
CMGT 3500

Document information

Uploaded on
October 17, 2025
Number of pages
4
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Freshy Oxford University
Follow You need to be logged in order to follow users or courses
Sold
62
Member since
2 year
Number of followers
4
Documents
6986
Last sold
2 weeks ago

3.6

10 reviews

5
3
4
4
3
1
2
0
1
2

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions