,List several measures that describe the size of the construction industry - ANS - accounts
for 2/3 of $1-trillion in expenditures per year in new construction
- constitutes about 5% of GDP
-6% (7.5 mill) of workers of the industrial workforce is employed directly in the construction
A
industry
-the construction industry represents the largest single production activity in the American
R
economy
Under what conditions might the funding of public construction projects be particularly high? -
ANS periods of recession
U
why is the construction industry referred to as an easy entry and easy exit industry? - ANS
high growth rate in construction
LA
low capital requirements
little absolute cots or profit advantage for established firms
most states have no rigid licensing requirements or fees
C
What are the ramifications of the cyclic tendencies experienced in the construction industry? -
ANS some firms exit the industry without the benefit of choice, they fail.
O
periods of recession, weak local economy , competition increases, causing profit margins to
decrease which results in failure of construction companies
D
Contrast the financing of public versus private construction projects? - ANS private:
funded through:
-expenditure of existing capital
-direct loans from outside creditors
-sale of fixed assets
-issuance of additional shares of stock/corporate bonds
-endowments
public:
funded through:
, -appropriations from annual operating budgets (general taxation)
-special taxation assessments for specific purposes
-bond issues for specific purposes
-endowments
What are some advantages and disadvantages of the general contract approach?
(design-bid-build) - ANS Advantages:
-gives the owner a firm idea of the final costs of the project
-GC has skills that should reduce cost to owner
-GC maintains a staff of trained supervisors
-clearly defined roles for each contracting party
A
disadvantages:
-often extends project duration
R
-owner does not have an agent involved in contractual arrangements
-leads to tight bids and small profit margins
-exposes owner a greater probability to claims
U
Discuss the criticisms that have been made of public agencies performing construction services
by the self-performance or force account method - ANS -instances in which the public
owner submitted a bid on competitively bid projects, owner is frequently the low bidder
LA
-other cases; owner does not permit private contractors to submit bids- the contractors state
they're placed at an unfair disadvantage
-say that owners do not charge properly for the costs of owning and operating heavy equipment
What type of project might be ideally suited for the design-build or design-construct method? -
ANS popular in constructing large, industrial type projects
C
no extensive design on which to compute a bid
it is possible to begin construction before completion of the design for the project
O
What are the advantages of using the professional construction management approach? - ANS
to the owners benefit
D
CM gives the owner a GMP that the project cost will not exceed
permits flexibility for changing the project as the design evolves
fast-tracking projects are good for this approach
Which types of contractual arrangements lend themselves to fast-tracking? - ANS projects
to be delivered quickly