Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CMGT 3500 Test 3 Exam Questions And Answers

Beoordeling
-
Verkocht
-
Pagina's
4
Cijfer
A+
Geüpload op
17-10-2025
Geschreven in
2025/2026

Unlike other businesses, the construction industry is paid on periodic payments for progress of completion of a project. - ANS True An express warranty is one that clearly stated either verbally in writing. - ANS True The duration of a project is measured against substantial completion to determine: - ANS When the last periodic payment can be made Retainage is: - ANS Used as incentive for the contractor to complete the project Project Closeout - ANS - Preparations should begin at the start of construction - Should include Contractor self-inspections - May create a loss on a project to the contractor if it is drawn out -Provides the creation of a punchlist A warranty is - ANS A certification that an aspect of a contract is promised to be, and based on a specified time period of validity When a project is accepted, the Owner should carefully inspect the project for any defects, and resolution of defects should take place after final payment is made. - ANS False Patent defects are defects not readily observed - ANS False The general contractor is responsible for: - ANS -Performance of subcontractors -All materials and equipment furnished -Contractor assisted selection of materials with the owner An implied warranty means that the contractor guarantees that the completed project will be suitable for its intended purpose. - ANS False The courts have ruled that Owner's inspection and acceptance of work waive any claims that result from the Contractor's defective performance, except latent defects. - ANS True Subcontractors: - ANS Are independent contractors hired by General Contractors General Contractors: - ANS Have the right to "take steps it deems necessary to correct deficiencies and charge the cost..." against subcontractors General Contractors involve themselves into a subcontractor's employer-employee relations when they dictate that "Subcontractors shall not employ any worker whose employment may be objected by any subcontractor or the General Contractor." - ANS True The terms of a subcontract: - ANS -Form the legal document by which the relationship between the general contractor and subcontractor is defined. - Not followed may preclude recover if a claim is made. -Must be understood by the subcontractor What is the most frequently cited disadvantage of resolving disputes through court decisions? - ANS Construction project contractual arrangements are unlike those encountered by the rest of the business world. The best method to use when solving a dispute between contracting parties is: - ANS Negotiation Mediation is a nonbinding method of dispute resolution that contains elements of litigation and arbitration - ANS False Documentation of all information is critical because it is impossible to predict what subject matters may become sources of disputes. - ANS True Which method of dispute resolution is traditionally the most popular alternative to litigation? - ANS Arbitration Which of the following organization shops is no longer legal? - ANS Closed Shop The organized refusal of workers to work at a particular place of employment: - ANS Strike The Davis Bacon Act of 1931: - ANS Protects the local wage rates and economy of the local community. Labor disputes may cause picketing by a union to take place near the Union entrance of a job site. Other union members, not striking, will generally honor a picket line by not passing through it. - ANS True The difference between a lockout and a strike are: - ANS -Lockouts prohibit union workers from entering the place of work -Strikes occur when workers decide to stop working or an employer Differing subsurface site conditions may include: - ANS -Presence of a high water table -unstable foundation materials -unexpected rock in softer materials -undisclosed utility lines Requiring contractors to make an independent site visit and investigation shifts some of the responsibility of site knowledge to the contractor. - ANS True For a contractor to be reimbursed for differing site conditions, the cost of construction has to be proved to be adversely affected by the changed condition. - ANS True Float is owned by the: - ANS Dependent on the terms of the contract Construction Schedules are based on the project duration and the method utilized to determine days - ANS True Liquidated damages provide compensation to the contractor for financial and other losses resulting from delayed completion. - ANS False A submittal log tracks the status of shop drawings, product data, test reports, samples and other documents that are: - ANS -required to be submitted for a construction project -Necessary for quality control of the project -Affects cost, quality, schedule, and project success

Meer zien Lees minder
Instelling
CMGT
Vak
CMGT








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CMGT
Vak
CMGT

Documentinformatie

Geüpload op
17 oktober 2025
Aantal pagina's
4
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.39
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
DocLaura Galen College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
159
Lid sinds
2 jaar
Aantal volgers
38
Documenten
6400
Laatst verkocht
1 week geleden

4.2

44 beoordelingen

5
27
4
4
3
10
2
2
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen