Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Essential Guide to Michigan Builders License Exam. A Comprehensive Exam Study Guide 100% Verified and Certified by Expert Latest Updated Guide 2025/2026

Rating
-
Sold
-
Pages
34
Grade
A+
Uploaded on
20-10-2025
Written in
2025/2026

Essential Guide to Michigan Builders License Exam. A Comprehensive Exam Study Guide 100% Verified and Certified by Expert Latest Updated Guide 2025/2026

Institution
ALA - Association Of Licensed Architects Member
Course
ALA - Association of Licensed Architects Member

Content preview

Essential Guide to Michigan Builders License
Exam.
A Comprehensive Exam Study Guide 100%
Verified and Certified by Expert
Latest Updated Guide 2025/2026
Created to serve as a complete, comprehensive code regulating the construction of single-
family, two-family and buildings consisting of three or more townhouse units. - ansIRC
(International Residential Code)
Administrative - ansFirst 2 chapters of code book are
True - ansPlans or supporting documents are almost always required by the controlling
authority prior to issuing a permit. T or F
Yes - ansDoes the building official have the authority to render interpretations of the code?
8 foot fence. - ansNone of the following require a permit, EXCEPT:
sidewalks and driveways
tiling
an 8 foot fence
playground equipment
False - ansTables and illustrations are always supported by information found in the written
code and footnotes. T or F
Live load. - ansThe amount of evenly distributed weight imposed by inhabitants, goods and
removable objects on a floor or roof system is referred to as
True. - ansIf a code requirement is in the book, it is both acceptable and enforceable by the
code official. T or F
Figures. - ansIllustrations are typically referred to as
Determine that buildings are built to the minimum enforceable standard. - ansGenerally
speaking, the building official's job is to
True. - ansIt is required that all manufacturer instructions be at the jobsite at the time of
inspection. T or F
Kitchen. - ansAll of the following are not considered habitable spaces EXCEPT:
bathrooms
kitchens
storage spaces
closets
3. - ansBathrooms must be provided with an aggregate glazing area no less than _____ square
feet, half of which must be openable.
44 inches. - ansThe maximum height of an egress window above the floor is
5.7 sq ft. - ansA basement bedroom must have an egress window with a clear opening of at
least ______ square feet.
3. - ansAt least one side-hinged exit door must be in each dwelling unit, and must be _____
feet wide.
30 inches. - ansA porch more than _____ inches above grade must be provided with 36"
guards.
200. - ansWall and ceiling finishes shall have a flame-spread classification of no more than
______ .
7 days. - ansAccording to code, concrete must reach at least 70% of it's ability within
____________days.
40%. - ansA stud used for a non-bearing partitions may not be notched more than ____% of
the stud width.

,Essential Guide to Michigan Builders License
Exam.
A Comprehensive Exam Study Guide 100%
Verified and Certified by Expert
Latest Updated Guide 2025/2026
Additions, alterations, renovation and repairs. - ansThe Michigan Uniform Energy code
applies to new buildings as well as
U-factor. - ans___________ is a measure of how well the window or door assembly conducts
heat. The lower the number, the better insulation the assembly will provide.
50%. - ansEnergy losses from recessed lighting fixtures can often reach ___% of the total
thermal loss of a ceiling.
R-3. - ansMichigan requires a minimum thermal resistance of ____________for mechanical
system piping.
True. - ansOversized HVAC equipment has a higher initial cost, a higher operating cost,
provides less comfort, and shorter life expectancy. T or F
Prescriptive Path. - ans_______ is the compliance route that applies Table 402.1.1 to building
envelope components, and is considered the most simple.
Area weighted averages. - ans___________ can be used to satisfy U-factor and SHGC
requirements.
IC (Insulation Contact) - ansRecessed lights must be _____ rated.
True. - ansUp to 15 square feet of glazing per dwelling unit is exempted from U-value
requirements. T or F
Registered design professional. - ansThe 2009 IECC requires a permanent certificate posted
on the electrical distribution panel. The certificate shall be completed by the builder or
State energy code requirements. - ansOne hurdle contractors face when bidding for an energy
efficient project is choosing materials that fit the design, and also meet
False. - ansHistorically significant buildings are not exempt from code changes. T or F
R-value
Settled thickness
Manufacturer name - ansInsulation products (blown and sprayed) must be documented with:
March 2011. - ansThe new Michigan codes took effect in
10. - ansBelow grade walls are insulated from the top of the basement wall down to _____
below grade, or the basement floor, whichever is less.
Area weighted average. - ansThe _______ is the combined Solar Heat Gain Coefficient of all
the glazed fenestration products in the building.
Thermal insulation R-values
Design criteria
Equipment systems - ansPlans and specifications must be detailed in regards to:
2009. - ansIn Michigan, the residential energy code is based on the _____ IECC, with certain
amendments.
Air leakage. - ans___________ is the rate of air infiltration in the presence of a specific
pressure differential.
Windows
Attic access hatches
Recessed lights - ansAir leakage is the random movement of air into and out of ________
through cracks and holes.
Table 402.1.1
2009 IECC - ansR-values for insulation and fenestration requirements by component can be
found in

,Essential Guide to Michigan Builders License
Exam.
A Comprehensive Exam Study Guide 100%
Verified and Certified by Expert
Latest Updated Guide 2025/2026
International Energy Conservation Code - ansIECC
U-factor and UA alternatives. - ansThe _____________ compliance method allows for more
innovative construction techniques like SIPs or Advanced Framing.
500 sq feet - ansR-30 is permitted in vaulted ceilings, but is limited to
True. - ansFloor insulation must be installed to maintain permanent and continuous contact
with the underside of the subfloor decking. T or F
5, 6 and 7. - ansMichigan falls into climate zones
False. - ansIt is permissible for supply ducts to be run through the framing cavities of a
residential building. T or F
IC rated (Insulation Contact) - ans__________ means an electrical fixture has been tested and
listed as suitable for installation in a cavity where the fixture may come in contact with
insulation.
3%. - ansAccording to the Dept. of Energy, improved energy codes could reduce CO2
emissions by
300 sq ft. - ansAttic insulation markers must be installed every _____ square feet.
True. - ansBuildings that are exempted from the new regulations are those with very low
energy use or ones that are neither heated or cooled. T or F
Yes. - ansA contractor needs to remove a non-load bearing wall, does he need to pull a
permit?
No. - ansA concrete contractor has been hired by an owner to install a driveway and
sidewalks. The lot is flat and the concrete is being place on undisturbed earth with a prepared
base. Does the contractor need to pull a permit?
Yes. - ansA permit has been issued for a building project and there is a code infraction in the
building plans that has been overlooked by the building official. Can the building official
require a correction to a project that they previously overlooked?
Health department. - ansWho issues a well and septic permit?
200 sq. feet.
IRC R105 - ansPermits are not required for one story detached accessory structures not
exceeding:
The next business day. - ansIf work requiring a permit is provided in an emergency situation,
the permit application must be submitted within:
True. - ansIf an inspection official is refused entry to a building project, the official will have
recourse to the remedies provided by law which include securing a warrant from the court
and returning with an officer of the law.
No.
IRC R104.8 - ansCan a building official be held liable for any damage occurring to persons
or property as a result of their actions or inaction?
Yes. - ansAn owner needs a foundation wall repaired, it has seriously buckled due to
excessive lateral loading from soil pressure. Does the contractor need to pull a permit?
6 ft.
IRC R105.2 - ansAlthough contractors should check for restrictive covenants and local
zoning requirements, a permit isn't required from the building official for installing a fence
not over _______ tall.

, Essential Guide to Michigan Builders License
Exam.
A Comprehensive Exam Study Guide 100%
Verified and Certified by Expert
Latest Updated Guide 2025/2026
180 days. - ansIf a permit is applied for but not yet approved and the applicant is not
persueing approval after______ days the application will be considered abandoned.
Yes. - ansCan a building official revoke a Certificate of Occupancy?
True. - ansWhen a project requiring a permit has commenced prior to the issuance of a
permit, the building official is authorized to charge an additional fee. T or F
450 - ansFoam plastic is used as insulation. The flame spread index cannot exceed 75 and the
smoke development index cannot exceed
8". - ansFoam plastic used for interior trim shall have a maximum thickness of 1/2" and a
maximum width of
10%. - ansFoam plastic interior trim must not constitute more than __________ of the total
wall and ceiling area of any room or space.
1/2". - ansFoam plastic used as insulation in walls must be separated by an approved thermal
barrier. What is the minimum thickness of gypsum wall board being used as a thermal barrier
for spray foam insulated walls?
Framing. - ansWhich of these inspections happens last?
Mechanical rough
Plumbing rough
Framing
Electrical rough
Yes. - ansA retaining wall will be five feet tall from the bottom of the footing to the top of the
wall. Do you need to pull a permit?
At the time of inspection. - ansYour building is utilizing engineered products such as
engineered floor joists. When do the installation instructions need to be available at the work
site?
1 3/8" solid wood
1 3/8" honeycomb core
20 minute fire rated
Any of the above - ansA door directly between a garage and a residence shall never open
directly into a sleeping room. The door must also be
1 1/4" - ansThe nosing for stairs shall not be less than 3/4" but not be more than
No. - ansA front porch is 25 inches above the grade below. Are guards required to be
installed?
False. - ansIf a smoke alarm is in a bedroom, it doesn't need to be right outside the bedroom
also.
1/2" - ansIf spray foam insulation is used to insulate a wall, what is the minimum thickness of
drywall needed to cover the foam plastic?
200 - ansFinishing materials used for walls and ceiling shall have a flame-spread index not to
exceed
No. - ansWood joists are 19" above exposed ground. Do they have to be preservative treated
or naturally durable wood?
True. - ansYou may bulldoze, grade and remove tree stumps in a wetland as long as you have
a permit.

Written for

Institution
ALA - Association of Licensed Architects Member
Course
ALA - Association of Licensed Architects Member

Document information

Uploaded on
October 20, 2025
Number of pages
34
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$15.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
charleswest Oxford University
Follow You need to be logged in order to follow users or courses
Sold
76
Member since
5 year
Number of followers
63
Documents
3839
Last sold
2 months ago

3.8

13 reviews

5
6
4
2
3
3
2
0
1
2

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions