1
ICC VAPOUR RECOVERY VT EXAM LATEST VERSION -
2025/2026- 100+ QUESTIONS AND VERIFIED ANSWERS ALL
THE BEST
On new construction, after July 1, 2004, Can you install an in-ground Spill Bucket?
YES-When Piping is monitored and with VAC
According to Executive Order 201 - Healy P/V Valve should be torqued at
20-50 ft-lbs
For a fire to burn, these (3) three primary elements must exist:
Fuel, Oxygen, Ignition Source
When working with Electrical - Lock Out Tag Out procedures are under these
guidelines.
CAL-OSHA
Type of sealant you should you use on a Phil-Tite Ball Float nipple:
Pipe dope
Number of open valves on the clean air separator:
One
You must be CERTIFIED by Healy to re-connect a Healy breakaway, True or False?
False
The type of pressure gauge is recommended to test Healy Vac
SYSA gauge measuring 0-100 WC
Organization that certifies vapor recovery systems.
, 2
CARB or ARB
According to RP 500, a level II technician may NOT inspect this part.
Replace VP 1000 Healy Pump
where hanging hardware repairs must be tracked.
GDF maintenance log
approved sealant when assembling a Phil-Tite Drop Tube.
JB-Kwik
Material direct bury OPW container sleeve shall be made of.
Stainless steel
What P/V vent cap shall be tightened to.
20-50 ft lbs
From dispenser to manifold - 2" diameter vapor piping ( 2" ID) and From manifold
to tank - 3" diameter vapor piping (3" ID)
Vapor piping
What is the maximum run for vapor piping?
No maximum run
How you know a nozzle spout is bad.
'BAD O-rinqs
According to PEI RP 300, on a balance Stage II vapor recovery system nozzle,
Vapors typically flow in what direction of the coaxial hose?
The outside pathway
What is the maximum allowable number of P/V caps allowed on a UST fuel
system?
One
ICC VAPOUR RECOVERY VT EXAM LATEST VERSION -
2025/2026- 100+ QUESTIONS AND VERIFIED ANSWERS ALL
THE BEST
On new construction, after July 1, 2004, Can you install an in-ground Spill Bucket?
YES-When Piping is monitored and with VAC
According to Executive Order 201 - Healy P/V Valve should be torqued at
20-50 ft-lbs
For a fire to burn, these (3) three primary elements must exist:
Fuel, Oxygen, Ignition Source
When working with Electrical - Lock Out Tag Out procedures are under these
guidelines.
CAL-OSHA
Type of sealant you should you use on a Phil-Tite Ball Float nipple:
Pipe dope
Number of open valves on the clean air separator:
One
You must be CERTIFIED by Healy to re-connect a Healy breakaway, True or False?
False
The type of pressure gauge is recommended to test Healy Vac
SYSA gauge measuring 0-100 WC
Organization that certifies vapor recovery systems.
, 2
CARB or ARB
According to RP 500, a level II technician may NOT inspect this part.
Replace VP 1000 Healy Pump
where hanging hardware repairs must be tracked.
GDF maintenance log
approved sealant when assembling a Phil-Tite Drop Tube.
JB-Kwik
Material direct bury OPW container sleeve shall be made of.
Stainless steel
What P/V vent cap shall be tightened to.
20-50 ft lbs
From dispenser to manifold - 2" diameter vapor piping ( 2" ID) and From manifold
to tank - 3" diameter vapor piping (3" ID)
Vapor piping
What is the maximum run for vapor piping?
No maximum run
How you know a nozzle spout is bad.
'BAD O-rinqs
According to PEI RP 300, on a balance Stage II vapor recovery system nozzle,
Vapors typically flow in what direction of the coaxial hose?
The outside pathway
What is the maximum allowable number of P/V caps allowed on a UST fuel
system?
One