Before new equipment arrives at the plant, plans for installing it are made by the
• Equipment manufacturer
• Maintenance supervisor
• Plant engineer
• Plant superintendent - Answers • Plant engineer
When pouring a concrete footing, you should hold the steel rods in position with
• metal clips.
• tack welding
• tie wires
• wooden braces - Answers • tie wires
The type of bolt to anchor the equipment is usually specified by the
• equipment manufacturer
• maintenance department.
• plant engineer
• plot plan - Answers • equipment manufacturer
To isolate anchor bolts when mounting equipment on pads, surround the bolts with
• coil springs
• neoprene tubing
• plastic sleeves
• steel bushings - Answers • neoprene tubing
To drill anchor bolt holes larger than 1^1/_2 in., you should use a
• Core bit with a diamond or carbon tip
• high-speed steel drill
• solid carbon-tipped bit
, • tool steel drilli - Answers • Core bit with a diamond or carbon tip
Which of the following should be used to set equipment anchor bolts in an existing foundation?
• Coarse concrete
• Fine concrete
• Grout
• Mortar - Answers Grout
Grout must be used within________of mixing
• 15 min
• 1 hr
• 2 hr
• 4 hr - Answers • 15 min
To smooth an exposed area of grout, you should
• apply carborundum grit
• cover it with mortar
• paint it
• sand it - Answers • cover it with mortar
What must you do first before disconnecting the electrical wiring to existing equipment?
• Check the line voltage.
• Open the switch box
• Shut off the power.
• Tape the exposed wire ends - Answers • Shut off the power.
When moving equipment with a crowbar, what should you use between the bar and the floor?
• A piece of pipe
• A thin steel plate
• A wad of waste material